My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:07:33 PM
Creation date
6/28/2019 1:22:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLUOR DANIEL GTI <br /> f <br /> i <br /> I <br /> I <br /> November 30,1998 <br /> Mr.Harlin Knoll <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue,Third:Floor <br /> Stockton,CA 95202 <br /> Subject: Groundwater Monitoring Well Installation Work Plan <br /> The Southland Corporation 7-Eleven Facility#20632 <br /> 4627 Da Vinci Drive <br /> Stockton,California <br /> Fluor Daniel GTI Project 102483 <br /> Dear Mr. Knoll: <br /> Fluor Daniel GTI, Inc.(Fluor Daniel GTI)submits this letter on behalf of The Southland Corporation <br /> (Southland)as a work plan to install one groundwater monitoring well at the subject site (Attachment 1, <br /> Figures 1 and 2). The work is being'completed as required by the San Joaquin County Public Health <br /> Services to replace monitoring well MW-4 which was destroyed to avoid possible damage during the recent <br /> underground storage tank removal at the site. The scope of work includes drilling and sampling of one soil <br /> boring,installation of a monitoring well in the boring,,groundwater sample collection from the monitoring <br /> well,and preparation of an assessment report summarizing the methods and results of the work <br /> preformed. <br /> TASK 1: SITE-SPECIFIC HEALTH AND SAFETY PLAN/PERMITTING <br /> A site=specific Heath and Safety Plan will be prepared by Fluor Daniel GTI as required by the <br /> Occupational Safety and Health Administration(OSHA)Standard"Hazardous Waste Operations and <br /> Emergency Response"guidelines(29 CFR 1910.120). The document will be-reviewed and signed by all <br /> Fluor Daniel GTI personnel and subcontractors performing work at the site. <br /> Fluor Daniel GTI will conduct a technical review of the pertinent information associated with the site. <br /> Permits for drilling will be obtained from the SJCPHS. <br /> On-site underground utilities will be marked-by an underground utility'company, and Underground Service <br /> Alert(USA)will be contacted and requested to notify the local utility companies to mark the location of <br /> underground utilities surrounding the site. <br /> 757 Arnold Drive, Suite D/Martinez, CA 94553 USA (925) 370-3990 FAX (925) 370-3991 <br /> i«1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.