My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:07:33 PM
Creation date
6/28/2019 1:22:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/05/97 13:15 FAX 816 372 8781 FLUOR DANIEL GTI 004 <br /> I <br /> f <br /> FLUOR DANIEL GTI <br /> i <br /> TASK 4, REPORT PREPARATION <br /> Fluor Daniel GTI will prepare a report summarizing the data collected under the scope of work detailed <br /> above. The raportwill documentthe methods and results of the work,summarize laboratory analytical <br /> j results,and include appropriate maps. Following submittal of the summary report,Robert H. Lee and <br /> Associates will submitthe Tank Reline Permit Application for review and approval by the SJCDHS. <br /> Please contact our West Sacramento office at 91$-372-4700 if you have questions or comments about this <br /> work plan. <br /> Sincerely, <br /> Fluor Daniel GTI,Inc. Fluor Daniel GTI,Inc. <br /> Submitted by: Approved by: <br /> aj9nk� <br /> David Bean J Auchterlonie <br /> Associate Geologist Lead Geologist <br /> Project Manager <br /> Ed K.Simonis,R_G- <br /> Senior Geologist <br /> to <br /> c: Mr.Bob DeNinno-The SouNand Corporation <br /> Attachment <br /> 1., Site Plan V . <br /> � No.4422 C4 <br /> P <br /> aa7UvA m*A <br /> Pre-Tank-Rielining Soil Assessment Work Plan' February 3,1997 <br /> The SeLithland Carporation.+4827 OaVinci Drive,Stockton.CA 3 <br /> i <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.