My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:07:33 PM
Creation date
6/28/2019 1:22:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/05/97 13:14 FAX 916 372 8781 FLUOR DANIEL GTI 11003 <br /> g6��L°d �AG�9G11.G41 <br /> TASK g: 80:1-BORINCMWIL SAMPUNG <br /> Fluor Daniel GTI will supervise the advancement of six hydraulEcally-driven angled borings to a true vertical <br /> depth of approximately 15 feet below ground surface(BGS)using a truck-mounted direct-penWaWrt <br /> +GeoprobsTM rig at the locations shown on the site plan included in Attachment 1_ Boring locations may be <br /> adjusted in the field based on subsurface obstructions and general field conditions. The sampling rig will <br /> drive a 24nc -4ameter by 2-foot4ong stainless steel barrel Enod wb 24nuh-6ametar by 6-inch-long breSs <br /> sample tubes or 2-feet-long clear plastic tubing at each location. <br /> Soil samples will be collected from the borings at 15 feet BGS. The 15-foot sample will be oa;lected in <br /> native so9 approximately 3 feet beneath the and of each of the three USTs. All sampling equipment will be <br /> steam cleaned prior to samplMg the soil at each Interval. Each soil sample will be screened for <br /> hydrocarbon vapors using a photoionization detector(PIP. Soils encountered during drilling%VI be logged <br /> using the Unified Soil Classification Systgm dy a Fluor Daniel GTI field geologist.worid ng under the <br /> supervision of a CsE fornig registered geologist. One sample tube from each sampEng interval will be <br /> sealed with Teflon sheets,capped,taped,labeled,and placed an ice In an insulated container- Each <br /> sample will be analyzed by a State-certified analytical laboratory for benzene,toluene,ethyl benzene and <br /> xylenes(BTM,methyl-tert-butyl-ether(MTBE),and total petroleum hydrocarbons-ss-gasoline (TPH-G)by <br /> EPA methods 8020/8015 modified,and Total Lead following EPA method 6010- <br /> using the geoprobe technology,no soil will be generated during sampling. Water generated by steam <br /> cleaning will be contained and temporarily stored on site in DCCT-approved 55-gallon drums pending <br /> characterization and disposal. <br /> TASK 3: GROUNDWATER SAt.7PUNG <br /> Due to the shallow depth to groundwater,estemated to be 13 feet BGS,groundwater will likely be <br /> encountered in the boreholes. if there is sufficient groundwater recharge in the boreholes following <br /> extraction of the geoprobe sampling rods,water samples will be collected from two water-bearing borings <br /> and analyzed for BTM MTBE,and TPH-G using EPA methods 8020/8015 modified. if detected,the <br /> presence of MTBE in the groundwater will be confirmed using EPA method 8260_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.