Laserfiche WebLink
i <br /> i <br /> I <br /> FLUOR DANIEL GTI <br /> TASK 4: REPORT PREPARATION <br /> Fluor Daniel GTI will prepare a report summarizing the data collected under the scope of work detailed <br /> above. The report will document the,methods and results of the work,.summarize laboratory analytical i <br /> results, and include:appropriate maps. Following submittal of the summary report, Robert H. Lee and <br /> Associates will submit the Tank Reline Permit Application for review and approval by the SJCDHS. <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments about this <br /> work plan. <br /> L Sincerely, <br /> Fluor Daniel GTI,Inc. Fluor Daniel GTI, Inc. <br /> Submitted by: Approved by: <br /> i <br /> David Bean J Auchterlonie <br /> Associate Geologist Lead Geologist <br /> Project Manager <br /> i <br /> Ed K. Simonis, R.G. <br /> Senior Geologist. <br /> c: Mr. Bob DeNinno-The Southland Corporation �� ®,`` <br /> Attachments <br /> 1. Site Plan <br /> ►� Na.4422 V <br /> I <br /> i <br /> i <br /> 0470wkp.wk4 <br /> Pre-Tank-Relining Soil Assessment Work Plan February 3,1997 <br /> The Southland Corporation,4627 DaVinci Drive,Stockton,CA 3 <br />