My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:07:33 PM
Creation date
6/28/2019 1:22:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> FLUOR DANIEL GTI <br /> .TASK 2: SOIL BORINGS/SOIL SAMPLING <br /> Fluor Daniel GTI will supervise the advancement of six hydraulically-driven angled borings to a true vertical <br /> depth of approximately 15 feet below ground surface,(BGS)using a truck-mounted direct-penetration <br /> GeoprobeTm rig at the locations shown on the site plan included in Attachment 1: Boring,locations may be <br /> adjusted in the field based on subsurface obstructions and general field conditions. The sampling rig will <br /> drive a 2-inch-diameter by 2-foot-long stainless steel barrel lined with 2-inch-diameter by 6-inch-long brass <br /> sample tubes or 2-feet-long clear plastic tubing at each location. <br /> Soil samples will be collected from the borings at 15 feet BGS. The'15-foot sample will be collected in <br /> native soil approximately 3 feet beneath the end of each of the three U3Ts. All sampling equipment will be <br /> steam cleaned prior to sampling the soil at each interval. Each soil sample will be screened for <br /> hydrocarbon vapors using a photoionization detector(PID). Soils encountered during drilling will be logged <br /> using the Unified Soil Classification System by a Fluor Daniel GTI field geologist,working under the <br /> supervision of a California registered.geologist. One sample tube from each sampling interval will be <br /> sealed with Teflon sheets, capped,taped,labeled, and placed on ice in an insulated container. Each <br /> sample will be analyzed by a State-certified.analytical'laboratory for benzene,toluene,ethylbenzene and <br /> xylenes(BTEX), methyl-tert-butyl-ether(MTBE); and.total petroleum hydrocarbons-as-gasoline (TPH-G)by <br /> EPA methods 8020/8015 modified, and Total Lead following EPA method 6010. <br /> Using the geoprobetechnology,'no soil will be generated during sampling::Watergenerated by.steam <br /> cleaning will be contained and temporarily stored on site in.DOT-approved 55-gallon drums pending <br /> characterization and disposal. <br /> TASK 3: GROUNDWATER SAMPLING <br /> Due to the shallow depth to groundwater, estimated to be 13 feet BGS,groundwater will likely,be <br /> encountered in the boreholes. If there is sufficient groundwater recharge in_the boreholes following <br /> extraction of the geoprobe sampling rods,water samples will be collected from two water-bearing borings <br /> and analyzed for BTEX, MTBE, and TRH-G using EPA methods 8020/8015 modified. If detected,the <br /> presence of MTBE in.the groundwater`will be confirmed using EPA method 8260. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.