My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DAVIS
>
8709
>
3500 - Local Oversight Program
>
PR0544612
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2019 12:41:58 PM
Creation date
7/1/2019 11:24:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544612
PE
3528
FACILITY_ID
FA0009287
FACILITY_NAME
NORTH STOCKTON AUTO SVC INC
STREET_NUMBER
8709
Direction
N
STREET_NAME
DAVIS
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242018
CURRENT_STATUS
02
SITE_LOCATION
8709 N DAVIS RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n d p <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: North Stockton Auto Service. <br /> Job Location: 8704 North Davis Road, Stockton, CA <br /> Client Name: Ed Niemann <br /> Project Number: 00-388 <br /> General Work Description: Advance five soil borings to collect soil and groundwater samples for <br /> the investigation of the current subsurface conditions related to a former underground waste oil <br /> storage tank. i <br /> SSP Prepared by:' Sean Garvey <br /> On-site Safety Officer: Sean Garvey <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> :i <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZA at the job site. All personnel working for GZA at the job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety 'provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If <br /> or working conditions require changes in safety procedures, appropriate <br /> changes in site.'h <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the ' <br /> written approval of the GZA Health and Safety Director. J <br /> f <br /> PAGE1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.