Laserfiche WebLink
Limited Groundwater Investigation—Work Plan <br /> 3314 N.Delaware Ave <br /> Stockton,California <br /> Page 3 <br /> 7.0 PROJECT SCHEDULE <br /> Condor will schedule the sampling event and obtain permits from San Joaquin County upon approval <br /> from the Client. Laboratory results are expected within two weeks of conducting the sampling. A report <br /> can be submitted to the Client within four weeks of the completion of the fieldwork. If you need <br /> additional information or have any questions,please call Luke Castle at(209) 536-7379. <br /> Respectfully submitted, <br /> CONDOR EARTH <br /> Luke Castle,PG#9945 <br /> Associate Geologist <br /> X:\Project\9000_pj\9216 Delaware Ave Stockton Phase II\Reports\Work Plan\FR 20241105 Work Plan.doc <br /> kxtz� <br /> �j CONDOR <br />