Laserfiche WebLink
Al � KLE € NFELDER <br /> Approximate Task <br /> Timeline <br /> Week 0 Formal authorization provided by the client <br /> Week 0-2 Permitting for Limited Groundwater Assessment <br /> Week—2 —3 Limited Groundwater Assessment Field Work <br /> Week 4 - 5 Chemical Analysis' <br /> Week 5 - 7 Report Preparation <br /> Week 7 Re ort Submitted to the Client <br /> Kleinfelder has no control over the time required by a regulatory agency to review and approve a work <br /> plan and permit applications or to supply information from their files for review. <br /> 2 This work will be done by a subcontractor. Kleinfelder selects reputable subcontractors, but, does not <br /> have full control over the time required by said companies. <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This proposal and the attached cost estimate are based on the following assumptions <br /> and responsibilities: <br /> • The Sims-Grupe Management Company will assist Kleinfelder in obtaining <br /> access to the site and owner authorization for the proposed sampling. <br /> • Traffic control if needed will be provided by others. <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to <br /> advance soil push probes and collect samples at the proposed locations. If the <br /> drilling equipment cannot be positioned or if refusal occurs, alternative drilling <br /> locations or sampling methods should be investigated. <br /> • Soil generated during the sampling will be placed in plastic bags and left onsite. <br /> The borings will be backfilled using grout or a bentonite-type slurry. <br /> • Soil and water generated during the drilling and sampling will be the <br /> responsibility of the client. Soil cuttings and decontamination rinsewater will be <br /> left on site. Sampling and analysis of the contained soil and water may be <br /> necessary prior to disposal. Disposal or remediation options for the soil and <br /> water can be assessed once analytical results have been received. Kleinfelder <br /> is prepared to assist the client and to remediate or dispose of stockpiled soil and <br /> water, if requested. <br /> • This proposal is based on the presumption that the client will clearly mark utilities <br /> and will provide any and all available survey maps or other data to determine the <br /> location of existing structures, underground utilities and services. The Sims- <br /> Grupe Management Company should be aware that penetrating the site's <br /> surface is inherently risky. It is impossible to determine with certainty the precise <br /> location of all structures, which may be buried in the ground. Kleinfelder's fee is <br /> not adequate to compensate for both the performance of the services and the <br /> assumption of risk of damage to such structures. Disruption of utilities or <br /> damage to underground structures will be the responsibility of the Sims-Grupe <br /> 02001 PROP.ENV/ST07P271/DGD:Iv/ra Page 5 of 8 <br /> ©2007 Kleinfelder October 31,2007 <br />