Laserfiche WebLink
Former George's Service Page 2 of 3 <br /> 1600 Durham Ferry Road December 1, 2014 <br /> Tracy, California 95376 <br /> • Groundwater analysis and depth-to-water measurements: MW-1, MW-2, MW-7, MW-8, <br /> OW-1 and OW-2 (TPHg, BTEX, MTBE, and 1,2-DCA by EPA method 8260B) <br /> Ground Zero has recommended that this current monitoring and sampling schedule continue <br /> through the third quarter of 2015 at which time Ground Zero has proposed a future schedule <br /> beginning the fourth quarter of 2015. <br /> In the Work Plan, Ground Zero proposes: <br /> 1. Changing the sequence of air sparging (AS) to the following order: OS-1, OS-2, AS-3, <br /> AS-1, AS-6, AS-5, and AS-2 for twenty minutes each followed by a thirty-minute delay <br /> prior to starting the sequence again; Ground Zero believes that this will reduce the <br /> potential for prolonged groundwater mounding; <br /> 2. Alternating the soil vapor extraction (SVE) well configuration monthly and recording the <br /> order in the field log book; Ground Zero believes this will inhibit the creation of <br /> preferential pathways in the vadose zone; <br /> 3. Monitoring the performance of the AS system by monthly recording the pressure, flow <br /> and cycle time for each AS well; recording pressure readings from the compressor to the <br /> manifold; recording total operating hours and checking the air manifold for leaks and <br /> repairing, if necessary; quarterly inspecting the AS wellheads for leaks and repairing, if <br /> necessary; and semi-annually performing maintenance on the compressor; <br /> 4. Recording volatile organic compound concentrations with a photo-ionization detector <br /> (PID) at the influent, intermediate and effluent sampling ports while measuring air flow at <br /> the influent and effluent during monthly operation and maintenance of the AS/SVE <br /> system; <br /> 5. Collecting air samples quarterly at the influent for analysis by a California-certified <br /> laboratory for TPHg, BTEX, MTBE and 1,2-DCA; and collecting air samples at the <br /> intermediate sample port if significant concentrations of petroleum hydrocarbon <br /> contaminants are detected by the PID; <br /> 6. Conducting the pilot AS/SVE pilot test for one year; <br /> 7. Evaluating the effectiveness of the remediation system semi-annually and reporting the <br /> findings in the semi-annual groundwater monitoring and treatment system effectiveness <br /> report; and <br /> 8. Beginning the fourth quarter 2015, continuing quarterly performance monitoring of <br /> MW-1, MW-2, MW-7, MW-101, OW-1 and OW-2 while collecting depth-to-water <br /> measurements and groundwater samples for analysis during the second and fourth <br /> quarters as presented in the Work Plan. <br />