My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 6:03:33 PM
Creation date
7/3/2019 3:33:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technics Ina <br /> 1172 Kansas Avenue <br /> t Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> www.gtienv.com <br /> ' Phase I Remedial Action Implementation Plan <br /> George's Service <br /> 1600 Durham Ferry Road <br /> Tracy, California <br /> ' Project No. 425.2 <br /> September 13, 2011 <br /> ' Plan Outline <br /> 1 <br /> Phase I• <br /> ' • Complete Permitting for Waste Discharge Requirements through the Regional Water ar <br /> Quality Control Board-work in progress <br /> • Perform Groundwater Monitoring on an annual basis during the 2nd Quarter of each of <br /> ' year, in the following wells: SW-101 and MW-7.-i2-jy_& At - Ste,( 7'-u'lisS <br /> • Measure DTW during the annu� Groundwater Monitoring Event in the following t)t <br /> wells: MW-5 and MW-8. '. 0 ,A k,i\�- q ..r 32,5�37, S ' b6r� <br /> ' • Assemble the following equipment for the air sparging system (Air compressor, <br /> controller, manifold, piping, fittings, pressure and flow gauges, distribution valves, a1c <br /> ' temporary fencing, electrical, air sparge timer). <br /> • During this initial phase, we propose to inject air into the following existing wells: <br /> OS-1, OS-2, and possibly MW-2. <br /> ' • Operate the air sparge system in bio-mode to help prevent degassing of the adsorbed <br /> and/or dissolved hydrocarbons into the vadose zone. To accomplish this, we propose <br /> to operate the system as follows: sparge for 15 min. in OS-1, followed by 15 min. in <br /> t OS-2, then system off for 30 min. and then repeat the cycle. W\` <br /> • Monitoring schedules is as follows: <br /> o Groundwater Monitoring for Metals - Monitor wells (OW-2, MW-2 and MW- <br /> ' 106) for Arsenic and Hexavalent Chromium prior to air spargin1§ operations <br /> (October 2011), monitor the same three wells for metals in the 2' Quarter of S <br /> 2012 (March 2012) and finally monitor the same three wells for metals in the 4t1, <br /> ' Quarter 2012 (November 2012). <br /> o Performance Monitoring - Measure DO levels in wells (OW-2, MW-2 and MW- <br /> 106) on a monthly basis. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.