Laserfiche WebLink
Geological Technics Ina <br /> 1172 Kansas Avenue <br /> t Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> www.gtienv.com <br /> ' Phase I Remedial Action Implementation Plan <br /> George's Service <br /> 1600 Durham Ferry Road <br /> Tracy, California <br /> ' Project No. 425.2 <br /> September 13, 2011 <br /> ' Plan Outline <br /> 1 <br /> Phase I• <br /> ' • Complete Permitting for Waste Discharge Requirements through the Regional Water ar <br /> Quality Control Board-work in progress <br /> • Perform Groundwater Monitoring on an annual basis during the 2nd Quarter of each of <br /> ' year, in the following wells: SW-101 and MW-7.-i2-jy_& At - Ste,( 7'-u'lisS <br /> • Measure DTW during the annu� Groundwater Monitoring Event in the following t)t <br /> wells: MW-5 and MW-8. '. 0 ,A k,i\�- q ..r 32,5�37, S ' b6r� <br /> ' • Assemble the following equipment for the air sparging system (Air compressor, <br /> controller, manifold, piping, fittings, pressure and flow gauges, distribution valves, a1c <br /> ' temporary fencing, electrical, air sparge timer). <br /> • During this initial phase, we propose to inject air into the following existing wells: <br /> OS-1, OS-2, and possibly MW-2. <br /> ' • Operate the air sparge system in bio-mode to help prevent degassing of the adsorbed <br /> and/or dissolved hydrocarbons into the vadose zone. To accomplish this, we propose <br /> to operate the system as follows: sparge for 15 min. in OS-1, followed by 15 min. in <br /> t OS-2, then system off for 30 min. and then repeat the cycle. W\` <br /> • Monitoring schedules is as follows: <br /> o Groundwater Monitoring for Metals - Monitor wells (OW-2, MW-2 and MW- <br /> ' 106) for Arsenic and Hexavalent Chromium prior to air spargin1§ operations <br /> (October 2011), monitor the same three wells for metals in the 2' Quarter of S <br /> 2012 (March 2012) and finally monitor the same three wells for metals in the 4t1, <br /> ' Quarter 2012 (November 2012). <br /> o Performance Monitoring - Measure DO levels in wells (OW-2, MW-2 and MW- <br /> 106) on a monthly basis. <br /> 1 <br />