Laserfiche WebLink
Geological Technics Inc Page 4 <br /> g g <br /> Appendix A <br /> Project No 281 2 <br /> August 11, 1995 <br />' The detection limits for these analyses are as follows benzene, toluene,ethylbenzene, total xylenes 0 3 <br /> µg/l,and TPH-Diesel 50µg/l <br />' 28 Soil Boring Installation <br /> The soil borings will be drilled using a continuous flight hollow stem auger to a total depth to be <br /> determined but not to intercept the groundwater Soil cuttings will either be containerized in DOT <br /> approved 55 gallon drums,labeled or lain on and covered by plastic sheeting,and stored on site until <br /> their proper disposition can be arranged Soil samples will be collected for geological and analytical <br /> evaluation at five foot intervals Soil samples will be collected in 6 0 inch brass liners using a 2 0 inch <br /> modified California split spoon sampler All soil samples will be sealed with aluminum foil,capped, <br /> labeled and placed in a cooler at 4° Celsius for transport to the laboratory following Chain of Custody <br /> protocol <br /> Because every soil sample collected will not be submitted for laboratory analysis, a screening process <br /> will be used to gather additional information through field observation noting sediment type, <br />' especially grain size and clay content, moisture content, visible evidence of contamination, i e, color <br /> change due to reduction of iron or discoloration from hydrocarbons and other pollutants, and the <br /> readings above background on a organic vapor meter (OVM) The OVM is a field portable photo <br /> ionization detector that uses a 10 0 eV lamp to detect compounds with ionization potential below 10 0 <br /> eV(hydrocarbon range) <br /> The soil borings will be closed as follows after the last soil sample has been collected the augers will <br /> be lifted 3 feet and 50 pounds of bentonite will be poured through the hollow stem of the augers and <br /> hydrated with clean tap water A tremie pipe of sufficient length to reach the total depth of the <br /> boring will be installed through the center of the hollow stem augers and then the augers will be <br /> withdrawn from the hole The borehole annulus will be closed by pumping a neat cement grout <br /> (<4%bentonite/cement) through the tremie tube up to grade <br /> 2 9 Monitoring Well Construction <br /> The monitoring wells will be constructed with 4 0 inch diameter, schedule 40 PVC casing with flush <br /> threaded joints A screened interval will consist of 0 020 inch perforations extending from <br /> approximately 15 feet below and 5 feet above the water table <br /> A number three sand will be used to form a filter pack about the saturated zone(0 020") perforations <br /> and will extend two feet above this screened interval An annular sea] will be constructed by <br /> installing 100 pounds of granular bentonite that will be hydrated with tap water and be allowed to <br /> expand for a period of one hour In the remaining annulus, neat cement grout will be installed using <br /> a slurry pump and tremie pipe <br /> The well will be secured with a watertight locking cap encased within a traffic safe well box A well <br /> construction schematic is attached as Figure 3 <br /> Relative well collar elevations may be surveyed by a competent surveyor <br /> 210 Monitoring Well Development <br /> Within 48 hours of well installation after well sealing materials have had time to set, each monitoring <br /> well will be developed by mechanical surging and pumping until a clear stream is obtained All <br />