Laserfiche WebLink
Geological Technics Inc Page 5 <br /> Appendix A <br /> Project No 281 2 <br /> August 11, 1995 <br /> down hole equipment will be decontaminated before and between uses Development water will be <br /> removed from the well using either a bailer or a submersible pump and containerized in D O T <br /> approved drums (labeled contents under analysis) to await proper disposition After development <br />' the wells will be allowed to stabilize before they are purged and sampled <br /> 1 <br />