Laserfiche WebLink
GeofagualTec(rnws Inc Page 6 <br /> GEoundwater Monitoring Report <br />' Project No 425 2 <br /> April 23,2001 <br /> IRecommendations <br /> The following recommendations are made <br />' 1 The 12 monitoring wells and 3 domestic wells should be sampled for natural attenuation <br /> parameters during future monitoring events so it may be determined if remediation by <br /> natural attenuation is occurring - <br /> 2 The high concentration of contaminants at the source should be removed to provide <br /> protection to surrounding water wells, facility natural attenuation, and to achieve <br /> closure A work plan to achieve this goal has been submitted to and approved by SJC <br /> PHS/EHD for implementation The cost of this work has been approved by the <br /> USTCFP <br /> 40 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices It <br />' should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and inexact science Judgments leading to conclusions and recommendations are <br /> generally made with an incomplete knowledge of the site-specific conditions present <br /> • The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> i <br /> I <br /> 1 <br />