Laserfiche WebLink
PHASE I HYDROGEOLOGIC YNVESMATION WORK PLAN <br /> 4491 West Durham Ferry Road,Tracy,C211fornia <br /> DcIta Projcct No.40-91-732 <br /> Page 3 <br /> 2-3 Reglanni Hydrogeolo2y <br /> A regional map showing the ground water elevation contours for the unconfined aquifer for spring 1989 <br /> prepared by th.;San Joaquin County Flood Control Pnd Water Conservation District shows the direction of <br /> ground water flow is towards the north or northeasL Depth to ground water,is expected to be approximately <br /> 15 to 20 feet below the ground surface. <br /> 3.0 PROPOSED WORK PIAN <br /> Delta proposes to drill four additional soil borings and convert two of them into ground water monitoring <br /> wells. Two of the soil borings will be drilled directly over the former tank locations to determine whether <br /> petroleum hydrocarbons have impacted the soil at these locationG. Ile remaining two soil borings will be <br /> drilled and completed as monitoring wells to determine the presence or absence of petroleum constituents <br /> as gasoline,in the ground water upgradient of the site and in the direction of the inferred ground water flow. <br /> 3.1 Sol]Borings <br /> Two soil borings(SB-3 and SB4)will be drilled at the former locadons of the undergrouri storage tanks <br /> to a total depill of 15 feet to determine whether the soil at these locations had been impacted of petrolourn <br /> hydrocarbons as gasoline. Soil borin locations are shown in Figure 2. <br /> 9 <br /> 3.2 Sol]3ample Callectlon and Screenin <br /> A California-modifled split-barret sampler will be used to collect soil samples from the scil borings. Soil <br /> samples wiU be collected at S-foot interrals from each soil boring. Soil sampling will be performed in <br /> accordance-with ASTM 1586-84 standards, Three&inch brass tubes will be inserted into the California <br /> sampler to retain the soil sampke. Upon retrieval of each soil sample, the bottom tube will be capped, <br /> sealed, labeled,and stored on ice for transport to a state-certified laboratory for chemical analysis. Suits <br /> from the middle tube will be placed in jars and sealed with aluminum foi!for field screening for the presence <br /> of orgaiiic vapors with a PID. <br /> 3.3 Monitoring Well Installation <br /> Two 2-inch-diameter monitoring wells will be constructed to a depth of approximately 30 feet below ground <br /> to <br /> Surface obtain-,Amterlewl-measurerdents and-itdiind-W�it&���les.---Mottitoring <br /> located south of the site along the right-of-way of Durham Ferry Road,and monitoring well MW-3 will be <br /> V. <br />