My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006431
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:41:43 PM
Creation date
7/3/2019 4:38:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006431
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i • <br /> CLEARWATER <br /> G R 0 U 0 I N C <br /> The following options could be evaluated for remediating the soil <br /> o Excavation <br /> Enhanced bioremediation (btoventing) <br /> Soil vapor extraction <br /> 0 Dewatering <br /> The methods and feasibility of each of these alternatives will be evaluated based on <br /> the site specific parameters determined over the course of the site assessment <br /> Single or combined remedial approaches will be recommended as appropriate based <br /> on the results of the feasibility evaluation A conceptual remedial plan will be <br /> included in the analysis. <br /> 7.0 PROPOSED SCHEDULE <br /> The installation of the vapor extraction/btoventmg and air sparging wells can take <br /> place following approval of this workplan Well permits can be applied for once <br /> this plan is approved The following tentative schedule is proposed <br /> TASK COMPLETION DATE <br /> Collect water samples from all wells Early March, 1995 <br /> Submit workplan and permit March 21 <br /> applications for wells <br /> Install air spargmg and March 24 <br /> groundwater extraction wells <br /> Complete pumping, SVE and air Week of March 27 <br /> sparging pilot tests <br /> Prepare Problem Assessment Report Within three weeks of pilot test <br /> completion <br /> D-107/PILOT TEST WP 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.