Laserfiche WebLink
CLEARWA.�" <br /> TER <br /> iEnv,.oRm�n,ar5�.�«es <br /> 1 The mass of post-remediation TPHg remaining in the soil can be estimated assuming that the <br /> contaminated soil has a cylindrical shape with the height of 15 feet and a radius of 6 feet (Figure 4) using <br /> the following equation <br /> M(TPHg) _a (r)z (h) p (TPHg avg) <br /> where, r= radius = 6 ft <br /> h = thickness = 15 ft <br /> p = density = assume 100 lbs / W <br /> TPHg avg = 220 ppm or 0 00022 unitless (average TPHg concentration at CBI) <br /> M(TPHg)_Tc (6 ft)2(15 ft) 100 lbs /ft3 (0 00022) = 37 lbs <br /> Residual Mass of TPHg in soil = 37 lbs <br /> This calculation indicates that approximately 37 lbs of TPHg remain in the soil following remediation <br /> versus the 5,050 lbs which was present prior to remediation This indicates that the SVE/AS system was <br /> effective at removing more than 99% of the gasoline from the soil column beneath the site <br /> ® In groundwater, pre-remediation levels of TPHg were as high as 150,000 fig/L in MW-2 Separate-phase <br /> hydrocarbons were observed as sheen and or droplets in purge water from wells MW-1 and MW-2 on <br /> several occasions prior to remediation Post-remediation levels of dissolved-phase contaminants have <br /> dropped steadily over time Water samples from all wells except MW-1 and MW-2 have been non- <br /> detect for all hydrocarbons for several quarters of sampling Results from the most recent sampling <br /> event show that only low levels of dissolved-phase gasoline remain in samples from MW-1 (550 fig/L <br /> TPHg), and MW-2 (65 gg/L TPHg) Additionally, recent monitoring results indicate that benzene was <br /> only detected in one well, MW-1, at a concentration of 2 6 pg/L MTBE was the only Fuel Oxygenate <br /> detected and was only detected in two wells, MW-1 (78 fig/L) and MW-2 (6 3 fig/L) <br /> Conclusions and Recommendations <br /> At the time of UST removal in 1988, gasoline concentrations soil beneath the USTs were reported to be <br /> X10,000 mg/kg Following investigation activities, it was estimated that approximately 5,050 lbs of TPHg <br /> resided in the vadose prior to remediation Additionally, SPH had been observed intermittently in the <br /> areas of MW-1 and MW-2 Maximum pre-remediation dissolved-phase TPHg, benzene, and MTBE <br /> concentrations were 150,000 pg/L, 9,400 pg/L, and 3,800 fig/L, respectively <br /> Operation of SVE/AS system from November 1998 to September 1999 resulted in a dramatic reduction <br /> of contaminants beneath the site Based on system operation data, it was estimated that 7,377 lbs of <br /> TPHg were removed from the subsurface during remedial efforts <br /> • <br /> ZB107C Conf Borings/GWMR 1Q00 6 March 27, 2000 <br />