Laserfiche WebLink
DAN BARBER <br /> PAGE 2 <br /> groundwater, and must present cleanup levels for the site- In <br /> addition, the Final Remedial Plan should present an estimated <br /> time schedule for completing the remediation process', including <br /> any post remedial monitoring.-.expected. <br /> Guidance in determining appropriate cleanup levels for the -site <br /> can be found by referencing the Central Valley- RegionaRe Water <br /> The <br /> Quality Control Board, Central- 'V..-alley Regions Staff p r <br /> Desi ated Level Methodolo for' Waste Classification and Cleanu <br /> Level Determination and A compilation of Water Ouality Goals <br /> (call (916) 255-3000 for copies) , and .the State Water Resources <br /> Control Board's Policy No. 68-18., -Statement of Policy with <br /> Res h ect to Maintainin Hi ualit waters aters in California <br /> (enclosed) . _ <br /> please submit the above noted required information as a letter <br /> addendum to the Final Remedial.Plan to PHS/EHD 'by July 25,' 1994• <br /> If you have any questions or °wish to discuss this letter in more <br /> detail, please call me at (209) f468-3441. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division: <br /> SHS <br /> Linda Turkatte, Senior REN . Di ne inson, <br /> RE <br /> Site Mitigation Unit - Supervisor <br /> LT <br /> C,. Beth Thayer--CVRWQCB <br /> cc George Takemori-TEICHERT.,' .h <br /> C; Ramos Environmental Engineering <br /> c BCR and Associates-Mark -Richards <br /> t <br /> I <br /> i. <br /> I, <br />