Laserfiche WebLink
SPILL PREVENTION,CONTROL,AND <br /> COUNTERMEASURES PLAN <br /> Valley Pacific Petroleum Services,Inc. <br /> 1512 Weiss Way <br /> Escalon,CA 95320 <br /> TECHNICAL AMENDMENT CERTIFICATION <br /> Refer to revision 3 on Compliance Inspection Plan Review Page <br /> [40 CFR 112.3(d)] <br /> My representative has visited the Facility and, being familiar with the provisions of 40 CFR Part 112, I <br /> attest that this Technical Amendment to the Spill Prevention, Control, and Countermeasures Plan(SPCC) <br /> Plan has been prepared in accordance with good engineering practices, including consideration of <br /> applicable industry standards, that procedures for required inspections and testing have been established, <br /> and this Plan is adequate for the Facility. <br /> Valley Pacific Petroleum Services, Inc. is solely responsible for implementation of this SPCC Plan <br /> Amended July 19,2019. <br /> Engineer: Robert J.Job--) oROFES81p�+ <br /> JCy�4�F2 <br /> Signature: C 51592 rn <br /> * EXP 6,3012020 <br /> Registration Number:-C 51592 sj CIVIL �P <br /> oFCAL;�o�a <br /> State: California SEAL <br /> Date: July 19,2019 <br /> �� CONDOR <br />