Laserfiche WebLink
SPILL PREVENTION CONTROL AND <br /> COUNTERMEASURES PLAN <br /> Valley Pacific Petroleum Services,Inc. <br /> 1512 Weiss Way <br /> Escalon,CA 95320 <br /> SPCC Plan Preparation Prior to Facility Becoming Operational? <br /> [40 CFR 112.3(b)(1)] <br /> ® Yes <br /> ❑ No <br /> Original Date of Plan: May 8,2000 <br /> Date of Last Plan Amendment/P.E. Certification: March 22, 2016 <br /> Date of Last Plan Review: March 22,2016 <br /> Next review date on or before: March 24,2021 <br /> Designated Person(s)Accountable for Spill Prevention: <br /> Will Harp <br /> Regional Manager <br /> (209)649-6356 <br /> CERTIFICATION <br /> [40 CFR 112.3(d)] <br /> My representative has visited the Facility, and being familiar with the provisions of 40 CFR Part 112, I <br /> attest that this Spill Prevention Control and Countermeasures Plan (SPCC) Plan has been prepared in <br /> accordance with good engineering practices, including consideration of applicable industry standards,that <br /> procedures for required inspections and testing have been established, and this Plan is adequate for the <br /> facility. <br /> Valley Pacific Petroleum Services, Inc. is solely responsible for implementation of this SPCC Plan. This <br /> SPCC Plan is not complete without full implementation of the requirements of 40 CFR Part 112 and of the <br /> recommendations found in the SPCC Plan letter dated March 22, 2016. <br /> Engineer: Robert ob <br /> Signature: Q�tOFESSI ,. <br /> _� a o� <br /> Registration Number: C 51592Uj C 51592 <br /> cc EXP.6130116 <br /> State: California * SEA <br /> ClOw <br /> Date: March 22,2016 OF C <br /> 4M <br /> #04) CONDOR <br />