My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEISS
>
1512
>
2800 - Aboveground Petroleum Storage Program
>
PR0516194
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:33:23 AM
Creation date
7/10/2019 8:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516194
PE
2832
FACILITY_ID
FA0009167
FACILITY_NAME
VALLEY PACIFIC PETROLEUM ESCALON
STREET_NUMBER
1512
STREET_NAME
WEISS
STREET_TYPE
WAY
City
ESCALON
Zip
95320
APN
22708001
CURRENT_STATUS
01
SITE_LOCATION
1512 WEISS WAY
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION CONTROL AND <br /> COUNTERMEASURES PLAN <br /> Valley Pacific Petroleum Services,Inc. <br /> 1512 Weiss Way <br /> Escalon,CA 95320 <br /> SPCC Plan Preparation Prior to Facility Becoming Operational? <br /> [40 CFR 112.3(b)(1)] <br /> ® Yes <br /> ❑ No <br /> Original Date of Plan: May 8,2000 <br /> Date of Last Plan Amendment/P.E. Certification: March 22, 2016 <br /> Date of Last Plan Review: March 22,2016 <br /> Next review date on or before: March 24,2021 <br /> Designated Person(s)Accountable for Spill Prevention: <br /> Will Harp <br /> Regional Manager <br /> (209)649-6356 <br /> CERTIFICATION <br /> [40 CFR 112.3(d)] <br /> My representative has visited the Facility, and being familiar with the provisions of 40 CFR Part 112, I <br /> attest that this Spill Prevention Control and Countermeasures Plan (SPCC) Plan has been prepared in <br /> accordance with good engineering practices, including consideration of applicable industry standards,that <br /> procedures for required inspections and testing have been established, and this Plan is adequate for the <br /> facility. <br /> Valley Pacific Petroleum Services, Inc. is solely responsible for implementation of this SPCC Plan. This <br /> SPCC Plan is not complete without full implementation of the requirements of 40 CFR Part 112 and of the <br /> recommendations found in the SPCC Plan letter dated March 22, 2016. <br /> Engineer: Robert ob <br /> Signature: Q�tOFESSI ,. <br /> _� a o� <br /> Registration Number: C 51592Uj C 51592 <br /> cc EXP.6130116 <br /> State: California * SEA <br /> ClOw <br /> Date: March 22,2016 OF C <br /> 4M <br /> #04) CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.