Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> P PROJECT INFORMATION <br /> PROJECT NAME t,�P C l�l IZ PROJECT NUMBER 5 -�zs , WELL NOW J <br /> PROJECT MANAGER TYPE OF WELL Z Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well Casing Diameter <br /> 2-inch 4-inch Other C' Bailer - Type <br /> Well Total Depth _/5 (o4 feet below Top of Casing TD Pump Type <br /> Other - Specify <br /> Depth to Water L/ / feet below Top of Casing WL Hydroca,,bon Odors <br /> Water Column LengthA, feet es No <br /> Purge Volume Calculation ((Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> 1 r r 54/ x `- r 17 X = Calculated Purge Volume = ® gallons <br /> (WCL) (Multiplier) (NoVolumes) Actual Purge Volume gallons <br /> Multiplier (Casing Diameter [inches] = Galionslfinear foot) 2=0 17 4=0 fib 6= 1 5 8=2 6 <br /> Groundwater Parameter Measurement Meter Typ ,Si � Calibrated Yes No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) s,mhoslcm (NTU) mV t <br /> eg a r <br /> r YL <br /> M-110 f hl - p� <br /> /Z1 i <br /> ' d ti <br /> VAKASSOCIATES INC. <br /> ENVIRONMENTAL GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />