Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME P 1K 1 IZ T_ PROJECT NUMBER 54.425'r-,0W[ WELL NO MVV <br /> PROJECT MANAGER j TYPE OF WELL ✓ Monitoring Extraction Other <br /> RECORDED BY hf SAMPLED BY Ar DATE {fib I Zr <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well C ing Diameter / <br /> 2-inch 4-inch Other V1_ Bader - Type <br /> �, <br /> Well Total Depth j� 3 feet below Top of Casing,TD Pump - Type <br /> Other - Specify <br /> 6 <br /> Depth to Water , !/ feet below Top of Casing,WL Hydrocarbon 27 Odo�rs� <br /> Water Column Length - feet Yes !<' o <br /> Purge Volume Calculation (Water Column Length xZMultiplier x No Volumes = Calculated Purge Volume) <br /> ftZ-7x Qd x V = <br /> Calculated Purge Volume = galleons <br /> (WCL) - (Multiplier) (No Volumes) Actual Purge Volume = gallons_ <br /> Multiplier (Casing Diameter (inches] = Gallons/linear foot) 2=0 17 4=0 66 6=1 5 8=26 <br /> Groundwater Parameter Measurement Meter Types( 3�'60 Calibrated Yes_No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) umhoslcm (NTU) mV <br /> aen)'i& <br /> NN 0 <br /> r r F• it <br /> ILL 6 <br /> iw <br /> UWASSOCIATES INC. <br /> ENVIRONMENTAL GEOTECHNICAL AND MATERIALS PR0FESS1o14ALS <br />