My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2800 - Aboveground Petroleum Storage Program
>
PR0529406
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:35:40 PM
Creation date
7/10/2019 11:11:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0529406
PE
2832
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI External Tank Inspection <br /> UPRR—Stockton yard,Stockton,CA TNKO-0295 <br /> June 2019 <br /> anteagroup <br /> 2.6 INSPECTION INTERVAL <br /> Next Formal External Inspection(Fel)Interval <br /> Formal external inspection interval as determined from STI-SP001 standards shall not exceed 20 years. <br /> Next formal external inspection due before 5/15/2039. <br /> Next Formal Internal Inspection(FII)Interval <br /> Due to the size of the tank and the spill control,no Formal Internal Inspection interval was conducted in <br /> accordance with STI-SPD01. <br /> 2.7 DEFINITIONS <br /> Continuous Release Detection Method(CRDM) <br /> A means of detecting a release of liquid through inherent design. CRDM is passive because it does not require <br /> sensors or power to operate. Liquid releases are visually detected by facility operators. The system shall be <br /> designed in accordance with good engineering practice. <br /> Several acceptable and commonly used CRDM systems are as follows: <br /> • Release prevention barrier(RPB)(described in definition of release prevention barrier). <br /> • Secondary containment AST,including double-wall AST or double-bottom AST. <br /> • Elevated AST,with or without release prevention barrier. <br /> Release Prevention Barrier(RPB) <br /> A liquid containment barrier that is installed under the AST.Its purpose is to divert leaks toward the perimeter of <br /> the AST where they can be easily detected,as well as to prevent liquid from contaminating the environment.RPBs <br /> are composed of materials compatible with the liquid stored in the AST and meet appropriate engineering <br /> standards. Examples are steel (as in steel double bottom tanks), concrete, elastomeric liners or other suitable <br /> materials,provided the above criteria are met. <br /> Category 1(AST) <br /> The AST shall be repaired or replace if more than 3 square inches of any one square foot of the tank shell(i.e. <br /> approximately 2%)is found to be less than 50%of the original shell thickness,or if the remaining shell thickness <br /> of an area is less than 25%of the original shell thickness at any point. <br /> XINOGEM <br /> 9 us.artteagroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.