Laserfiche WebLink
Copy <br /> 5. That no drilling, or trenching, shall take place in the levee during times that the <br /> District feels the tides may create a dangerous condition. <br /> After receiving your plan for approval, the District may have other concerns or <br /> conditions. However, the above should cover most engineering concerns. <br /> If you have any questions, or require additional information, please call me at <br /> (916)456-4400. <br /> Sincerely, <br /> MURRAY, B RNS & KIENL <br /> ert Cosio, Jr. <br /> cc: Reclamation District No. 2029 <br /> c/o Mark Bray <br /> Mr. John Rocha <br /> Mr. A.E. Gianelli <br />