Laserfiche WebLink
Section 4: Planned Field Activities <br /> 1 Kennedy/Jenks has prepared work plans behalf of the Union Pacific Railroad Company (Union <br /> Pacific) describing field activities to be performed at the Site. The activities are being conducted <br /> on a voluntary basis by Union Pacific, and include: <br /> • Contracting the Subtronic Corporation to perform a geophysical survey to locate and <br /> map the culvert system north of the RIP facility. <br /> ' • Coordinating with Vironex to advance approximately 15 soil borings in the area north of <br /> the RIP area, and collect soil samples for laboratory analysis. <br /> ' • Remove and replace a drainage culvert in the vicinity of the August 2003 fuel release. <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Health and Safety Plan Page 5 <br /> Union Pacific Railroad Company, Stockton Railyard Site, Stockton, California <br /> g:ladminassNobs1200310327 77.16_union pacific-stocktm yard104reports19.09_reports12005 hasplhasp.doc <br />