My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0013107
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
ARCHIVED REPORTS XR0013107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:38 AM
Creation date
7/11/2019 9:15:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013107
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br /> Ay-yG .92 12 : 1 FLr. F,0,L <br /> P'Fr i I 303 9:318 5520 � WAGE . 00':A <br /> O <br /> i <br /> Health and Safety Plan <br /> Union Pacific Railroad <br /> Stockton Diesel Pipeline <br /> i <br /> Stockton, CA <br /> USPCI Job #96177 <br /> IN"1 RODUCT ON <br /> i <br /> T'he personal health and safety of all individuals directly involved in the Stockton Diesel Pipeline <br /> investigation, and the general public who may be in the vicinity of the site, is oeparticular <br /> ii <br /> concern to USPCI. Therefore, all prudent and reasonable measures will be taken to establish <br /> and maintain safe,.healthy working and environmental conditions. <br /> This Health and Safety Plan identifies the potential hazards associated with the project and the <br /> actions which will be taken to minimize or eliminate those hazards; e.g.. engineering controls, <br /> use of personal protective equipment, training, etc. Although every effort was made to develop <br /> a plan that is as comprehensive and detailed as possible, conditions may change once the project <br /> is initiated which warrant modification of this plan. Throughout each stage of the p'.oject, the <br /> plan will be reviewed and changed or modified as necessary. <br /> Modification of the plan will be responsibility of the USPCI Site Manager. Substanti. changes V� <br /> will be reviewed and approved by a member'of USPCI's Health and Safety staff. All on-site <br /> workers will be trained from this or any modified Health and Safety Plans. I <br /> 'Phis Health and Safety Plan applies only to the Stockton Diesel Pipeline site. Application of the <br /> plan has been based upon, and is contingent upon the data obtained during previous'i'studies on <br /> a portion of the site. <br /> Although it is not anticipated that the investigation will require it, an Emergency ]Response Plan <br /> is provided in this document. <br /> I� <br /> I . <br /> i <br /> I <br /> FNKOITMAP\$TOCffON.SSF-V23M <br />
The URL can be used to link to this page
Your browser does not support the video tag.