My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0013107
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
ARCHIVED REPORTS XR0013107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:38 AM
Creation date
7/11/2019 9:15:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013107
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 92 12 : 15 F Ro}� �`.;ISPC It] 8 552E <br /> PAGE . 004 <br /> SCUD OF WORK <br /> • Client's Business <br /> Union Pacific Railroad is in the railroad tt'ansportation business with 23,000 route miles <br /> almost exclusively west of the Mississippi River. <br /> ° History of the Site <br /> The site is an underground pipeline used to transport diesel fuel from the Port of <br /> Stockton to the UPRR yard in Stockton. The pipeline passes through devq, ped and <br /> undeveloped areas. This portion of the investigation will deal with a porton of the <br /> pipeline an organ area. , <br /> ° Specific Location of Work <br /> The work will be conducted in Stockton on 6th Street between Eldorado anI Lincoln <br /> Stets. <br /> ° Site Description/Dcscription of Surrounding Area. ` <br /> A copy of the Site Map taken from as--built drawings of the pipeline is included. <br /> ° Time Frame <br /> It is anticipated that the investigation will be conducted during the daylight hours in two <br /> phases. The first phase will consist of a Soil gas survey and be conducted onl April:27, <br /> 28, and 29, 1992. The second phase will include confirmatory drilling ands,sampling <br /> operations. This work will done from May 5th and 6th, 1991 <br /> I <br /> I � <br /> i <br /> j <br /> F_1RDTTMARWrC CKTON.HSP-4/23151 2 <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.