Laserfiche WebLink
' 92 12 : 15 F Ro}� �`.;ISPC It] 8 552E <br /> PAGE . 004 <br /> SCUD OF WORK <br /> • Client's Business <br /> Union Pacific Railroad is in the railroad tt'ansportation business with 23,000 route miles <br /> almost exclusively west of the Mississippi River. <br /> ° History of the Site <br /> The site is an underground pipeline used to transport diesel fuel from the Port of <br /> Stockton to the UPRR yard in Stockton. The pipeline passes through devq, ped and <br /> undeveloped areas. This portion of the investigation will deal with a porton of the <br /> pipeline an organ area. , <br /> ° Specific Location of Work <br /> The work will be conducted in Stockton on 6th Street between Eldorado anI Lincoln <br /> Stets. <br /> ° Site Description/Dcscription of Surrounding Area. ` <br /> A copy of the Site Map taken from as--built drawings of the pipeline is included. <br /> ° Time Frame <br /> It is anticipated that the investigation will be conducted during the daylight hours in two <br /> phases. The first phase will consist of a Soil gas survey and be conducted onl April:27, <br /> 28, and 29, 1992. The second phase will include confirmatory drilling ands,sampling <br /> operations. This work will done from May 5th and 6th, 1991 <br /> I <br /> I � <br /> i <br /> j <br /> F_1RDTTMARWrC CKTON.HSP-4/23151 2 <br /> II <br />