My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 11:47:20 AM
Creation date
7/11/2019 10:07:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CHRONOLOGY <br /> WEBER BLOCK SHELL STATION <br /> 141 EL- DORADO STREET - <br /> STOCKTON CA 95202 <br /> 1981 Five gasoline underground storage tanks removed this year. <br /> May 1990 Kleinfelder conducted a soil vapor survey at the site. Petroleum <br /> hydrocarbon contamination evidenced in the samples.analyzed. <br /> 09/05/90 Geoprobe site investigation conducted by Leedshill-Herkenoff; Inc. <br /> Soil contamination confirmed. <br /> 09/07/90 Prop 65 #90-196 filed this date. <br /> 09/21/90 Three groundwater monitoring wells installed on site. Soil and ground- <br /> water contamination confirmed. <br /> 01/02/91 Prop 65 #91-01 filed this date. <br /> 01/09/91 NOR and site letter sent this date to CM Weber Enterprises. J <br /> 03/26/91 - NOR,and site letter sent to Shell Oil Co. as additional responsible party. 1 <br /> 0415-8/91 Two additional groundwater monitoring wells installed on site. <br /> 0418-9191 Three vapor extraction wells installed on site. <br /> 11/07/91 One additional vapor extraction well, and two groundwater extraction <br /> wells installed on site. i <br /> 12/12/91 500-gallon waste oil tank removed this date under permit and inspection. <br /> 01/09/92 Unauthorized Release Report#92-U09 filed this date. <br /> 01/24/92 Soil vapor extraction began this date, utilizing an internal combustion <br /> engine. <br /> March 1992 Soil vapor extraction IC engine replaced with a thermal.oxidation unit. <br /> July 1992 Thermal oxidation unit replaced with activated carbon unit. <br /> 09/3-4/92 Confirmation soil borings C13-1 thru CB-9 advanced this date. <br /> 03/02/93 Groundwater extraction system began, in operation until Sept. 5, 1995. <br /> July 1994 Initiation of air sparging at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.