My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011667
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
ARCHIVED REPORTS XR0011667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:37:11 PM
Creation date
7/11/2019 11:25:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011667
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Wear appropriate respiratory protection when performing dusty work. (i.e. <br /> concrete cutting, mixing cement etc.) <br /> • Inspect wire, rope, hoisting hardware, swivels, hooks, bearings, sheaves, <br /> guides, rollers, clutches, brakes for the following: abrasions, breaks, wear, <br /> fatigue, corrosion, jamming and kinking. <br /> I <br /> • Suspension of loads when hoist is unattended should be avoided. <br /> Hoisting loads directly over field personnel shall not bep ermitted. <br /> Restrict hoisting operations during unfavorable environmental conditions such <br /> as rain or high winds. <br /> • Maintain safe distance from hoisting equipment (e.g., wire rope, hooks, pinch <br /> points) when slack is reduced. <br /> Responsibilities of driller, geologists, field crew, etc. during drilling operations <br /> shall be established before work activities are initiated. <br /> 0 Begin auger borings slowly with the drive engine operating at low RPMs. <br /> • Restrict contact with power coupling or auger during rotation. <br /> • Prevent placing hands or feet under auger during rotation. <br />' Prevent placing hands or feet under auger sections during hoisting over hard <br /> surfaces. <br />' Avoid the removal of soil/cuttings with hands or feet. <br />' Cleaning shall occur when drill rig is in neutral and the augers are not rotating. <br /> 7.3 Decontamination/Cleaning Activities Safety Guidelines <br />' Hazards/Controls <br />' The fact that decontamination or cleaning activities are taking place implies <br /> that chemical contamination is present and must be protected against. In <br /> addition, the cleaning agents may be irritating, or worse, and protective <br />' measures must be implemented. <br /> • Proper lockout/tagout procedures must be employed to prevent injury. <br /> Electrical circuits require special-attention. <br />?1 CRC Environments!Risk Management, Inc. project 52100-250-2 <br /> American Savings Bank 222 North El]Dorado Street <br />'' April 6, 1995 14 Stockton,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.