My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:54:53 PM
Creation date
7/11/2019 11:52:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Vicki McCartney [EH] <br /> From: Brian Millman [bmillman@advgeoenv.com] <br /> Sent: Thursday, September 02, 2010 11:41 AM <br /> To: Vicki McCartney [EH] <br /> Subject: Soil vapor Intrusion Sampling -Tracy Marine Sales (2353 Toste)and Weldon Church (104 Beverly) <br /> Hi Vicki, I hope your day is going well. I have several sites with September fieldwork coming up and they all <br /> seem to be yours@ <br /> September Field Work I would like to schedule: <br /> 1. Tracy Marine Sales (2353 Toste Road,Tracy)—14 September 2010-Soil vapor intrusion sampling in the <br /> morning. Field work will be performed between,8am-11pm <br /> 2. Weldon Church (104 W. Beverly Place,Tracy)—14 September 2010—Install 5 temporary soil vapor <br /> points and develop newly installed well MW-8. Field work will be performed between Ilam-4pm. <br /> 3. Weldon Church (104 W. Beverly Place,Tracy)—16 September -Sample 5 soil vapor points and advance <br /> 2 borings for soil vapor sample collection—Field work will be performed between Ilam-5pm. <br /> 4. Dens Auto (308 S EI Dorado)—21-23-September 2010—Install 3 monitoring wells in City of Stockton <br /> right of way. (this is tentatively scheduled still preparing city permits): <br /> I will submit the permit applications and fees shortly. <br /> Thanks for.your assistance, <br /> Sincerely, <br /> Brian W. Millman <br /> California Professional Geologist#8574 <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton• Santa Rosa• Monterey •Brea • Spokane•Reno <br /> 1-800-511-9300 <br /> 1-209-467-1118 (fax) <br /> 1-209-482-8556 (mobile) <br /> W lma....n...(ca advgeoenv_corn <br /> -www.advgeoenv.com <br /> 9/2/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.