My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:36:13 PM
Creation date
7/11/2019 11:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 June 2010 <br /> AGE-NC Project No. 95-0135 <br /> Page 6of7 <br /> be continued until field parameter (pH, electrical conductivity, and temperature) readings have <br /> stabilized and purged water is visually sediment-free. Additionally, well-head elevations will be <br /> surveyed by a licensed surveyor. <br /> i 4.4. GROUNDWATER SAMPLING PROCEDURES <br /> Ground water sample collection procedures are outlined below. <br /> I <br /> I <br /> 4.4.1. Static Water Level Measurements <br /> i <br /> Before purging and sampling the ground water monitoring wells,static water level will be measured <br /> using a Solist water level meter. Water level data will be recorded to the nearest 0.01 foot from a <br /> reference point marked of the top of the PVC well casing. Before and after each use, the electric <br /> water level indicator will be washed in-an Alconox solution and rinsed with water. <br /> i <br /> 4.4.2. Well Evacuation <br /> i <br /> Subsequent to measurement of depth to water and prior to sampling, wells will be purged using a <br /> using a Waterra inertia pump and dedicated tubing or disposable polyethylene bailers to ensure the <br /> ground water sample is representative of the formation,rather than water standing in the well casing. <br /> Wells will be purged until: 1)a minimumof three casing volumes is removed from the well;and/or <br /> 2) the field-measured ground water parameters:pH, temperature and electrical conductivity have <br /> stabilized.However,if a well is purged dry prior to evacuating three casing volumes,a ground water <br /> sample will be collected-following 80 percent recovery of ground water level within the well or <br /> within 8-hours of well,evacuation. <br /> Purge water,free-product,and decontamination water generated during the ground water sampling <br /> activities will be contained in DOT-approved drums which will be appropriately labeled for storage. <br /> Drums containing purge water will be stored on-site pending appropriate removal and disposal. <br /> 4.4.3. Sample Withdrawal <br /> Water samples will be�collected from the monitoring well using a dedicated Teflon tubing used in <br /> conjunction with the inertia pump or with disposable polyethylene bailers, feflon tubing used-with <br /> _ the inertia.-pump is either dedicated,to-each well changed_at each sampling event,thereby <br /> minimizing cross contamination due to sampling devices; disposable bailers are disposed of after <br /> i <br /> i <br /> Advanced GeoEnvironmental,Inc. <br /> I <br /> i <br /> a r <br />
The URL can be used to link to this page
Your browser does not support the video tag.