My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:36:13 PM
Creation date
7/11/2019 11:52:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�✓ ,../ <br /> 19 July 2005 <br /> AGE-NC Project No. 95-0135 <br /> Page 5 of 9 <br /> drill rig equipped with 8.25-inch hollow-stem augers. The total depth of each well boring may vary <br /> according to geologic/hydrogeologic conditions encountered during drilling.Proposed locations of <br /> the pilot soil borings, illustrated on Figure 2, are as follows: <br /> • On-site drilling(Phase 1):Two borings(1,2)will be advanced immediately southwest of the <br /> former dispenser island to depths of 65 feet bsg (HU2) and 120 feet bsg (HU3); _� NO sa: 1 <br /> UJ <br /> • One boring (3) will be advanced immediately south of the former waste oil UST (T4)to a S` <br /> depth of 65 feet bsg (HU2); <br /> • One boring (4) will be advanced near the midpoint between MW-1 and MW-2 to a total <br /> depth of approximately 120 feet bsg (HU3); and No so; j �p1 ri <br /> • Off-site drilling(Phase 2): Three borings (5, 6, 7)will be advanced across Lafayette Street <br /> near CPT-3 to total depths of approximately 45 feet(HU1), 65 feet(HU2) and 120 feet bsg <br /> (HU3). <br /> No <br /> ` Selected soil samples will be analyzed by a State of California Department of Health Services <br /> (DHS)-certified laboratory for the following constituents: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified; and <br /> • Benzene, toluene, ethylbenzene and xylenes (BTEX); and fuel additives methyl tertiary- <br /> butyl-ether(MTBE),tertiary butyl alcohol(TBA),di-isopropyl ether(DIPE),ethyl tertiary- <br /> butyl ether(ETBE),tertiary-amyl methyl ether(TAME), 1,2-dibromoethane(EDB),and 1,2- <br /> "' dichloroethane (1,2-DCA) in accordance with EPA Method 8260B. <br /> Laboratory reports of soil and ground water analysis, testing methods, laboratory quality <br /> assurance/quality control (QA/QC) reports, and sample chain of custody documentation will be <br /> presented in a report of findings and recommendations. <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT, AND SURVEY <br /> r <br /> The seven pilot soil borings will be completed as single-level ground water monitoring wells <br /> screened from 25 feet to 45 feet bsg, 60 feet to 65 feet bsg, or 110 feet to 120 feet bsg. Following <br /> installation, each well will be developed to maximize water flow and minimize the amount of <br /> fine-grained sediment drawn into the well during pumping or bailing. The top of the existing and <br /> newly installed well casings (well heads) will be surveyed to determine their elevation relative to <br /> mean sea level. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.