Laserfiche WebLink
Work""'Order Details <br /> 5742354: Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> This completed official regulatory PM work order record must be copied and transmitted to the facility Chief for recordkeeping at the facility. <br /> Asset: TES-POW-TNK-004 Generator #1 Secondary Containment Day Tank <br /> Metal: 12 Gauge <br /> Capacity: 150 US Gallons <br /> Tested Ai: 5 P.S.I, <br /> Location-, TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA. 95377 <br /> Cl: <br /> Sched Start: Site: WS Shop: WSCM <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 4/5/19 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0006 Job Plan: WS-FUL-TNK-INP-09-001 <br /> Actual Finish: Status: APPR JP description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 3/28/19 Parent: Crew: CM-EMT2 <br /> Reported By: SFONG Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone: 650-871-2013 GL Account: 25940-232422-10000-10029996+0016 Classification: <br /> wose�quence Task IDs <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Observa <br /> 0 10 12-Month EMT Inspection of Diesel To,* Components 1. Test local APPR 0 <br /> audible and visual alarms. �/ / <br /> 2. Test control panel indicator lights. +� <br /> 3. Check that all control panel wiring and cables are free of <br /> corrosion, gcoperly secured and tighten all terminal connections. <br /> 4. Test Hi vel alarm for local and remote activation. <br /> 5. Confirm that Iqbal level indication matches SCADA data point <br /> display. �,/ ` <br /> 6. Test tank leak detection system for operation. V/ <br /> 7. Test and calibrate local dial gauge display, <br /> S.Test and calibrate tank level monitoring. <br /> April 4, 2019 at 8:02:35 AM PDT 1 1 2 <br />