Laserfiche WebLink
f <br /> 0 0 <br /> Work Order Details <br /> 5166108:TES TK-004(contanimmnt)Reg ulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> wosequence Task IDs <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Observa <br /> 9. Verify that all electrical and munication connections are tight <br /> and free of corrosion, <br /> 10. Report any qeficiencies to immediate supervisor for follow-up <br /> repairs. <br /> 11.Qualified inspector must sign here. Include signature, printed <br /> name and date. <br /> Sign: c <br /> Print: <br /> Date: r; / <br /> Employee Signature& ©ate: Supervisor Signature & Date: <br /> ✓f-si� <br /> April 8, 2019 at 12:18:07 PM PDT 2 2 <br />