Laserfiche WebLink
Work Order Details 2- <br /> 5166110,TES TK-005 (contan€mmnt)Regulatory SPCC 12-Month Inspection o1 Diesel Tank Components <br /> This completed official regulatory PM work order record most be copied and transmitted to the facility Chief for recordkeeping at the facility. <br /> Asset:TES-POW-TNK-005 Generator#2 Secondary Containment Day Tank <br /> Metal: 12 Gauge " <br /> Capacity: 150 US Gallons <br /> Tested A€: 5 P.5.1. <br /> Location: TES Tesla Treatment Facility <br /> Cl, <br /> Sched Start: Site: WS Shop: WSCM <br /> Sched Finish! Priority. 6 Supervisor: <br /> Target Start: 4/5/18 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0007 lob Plan: WS-FUL-l'NK-INP-09-001 <br /> Actual Finish: Status: APPR IP Description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 4/5/18 Parent: Crew: CM-EMT2 <br /> Reported By: KNAVARRCT Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone. 650-871-1016 GL Account: 25940-232422-10000-10029996+0016 Classification: <br /> Job Plan Description <br /> wosequer%ce. Task IDs <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Obaervw <br /> 0 10 12-Month EMT Inspection of Diesel Tank Components 1.Test local APPR 0 <br /> audible and visual alarms.._�� <br /> 2.Test control panel indicator lights.—1... rIf <br /> 3.Check that all control panel wiring and cables are free of <br /> corrosion, properly secured and tighten all terminal connections. <br /> 4.Test t,HI h level alarm for local and remote activation. <br /> S. Confirm that jocal level indication matches SCADA data point <br /> display. <br /> 6.Test tank leak detection system for operation. <br /> 7.Test and calibrate local dial gauge display. 1 _ <br /> 8.Test and calibrate tank level monitoring. <br /> April 10, 2018 8:34:14 AM PDT 1 / 2 <br />