Laserfiche WebLink
Work carder Details <br /> 51G8110: E5 TK-005 ontanimmint] Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> Wasequence Task IDs <br /> Measurement <br /> Sequence Task ID Description Status, Point Value Date dbserva <br /> 9. Verify that all electrical and c mmunication connections are tight <br /> and free of corrosion. _. ��_. <br /> 10. Report a �deficiencies to immediate supervisor for follow-up <br /> repairs.I: <br /> 11, Qualified inspector must sign here. Include signature, printed <br /> name and date. <br /> Sign: <br /> Print: <br /> Date: <br /> Employee Signature& Date: [. 3 Supervisor Signature & Date: �Uf <br /> April 10, 2018 8:34:14 AM PDT 2 / 2 <br />