My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:28:07 PM
Creation date
7/11/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541548
PE
2832
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page 34 of 45 <br /> 3.0 PLAN REQUIREMENTS FOR PETROLEUM OIL-BASED <br /> FACILITIES [40 CFR§112.8 THROUGH 40 CFR§112.111 <br /> Section 3.0 of this SPCC Plan provides specific provisions of the Part 40 CFR§112—Oil Pollution <br /> Prevention(SPCC Rule)that apply to the Emergency Power Generation Facility where diesel fuel <br /> and engine oil are stored, handled, and maintained. <br /> Facility details are presented in Figure A-5.2 through Figure A-5.6 in Appendix A. <br /> 3.1 SPCC Plan Requirement [40 CFR§112.8(a)] <br /> This SPCC Plan was prepared to meet the general requirements in Section 40 CFR§112.7, and <br /> specific discharge prevention and containment in Section 40 CFR§112.8 of the SPCC Rule. <br /> 3.2 Facility Drainage [40 CFR§112.8(b)] <br /> The following addresses facility drainage requirements in 40 CFR§112.8(b) of the SPCC Rule. <br /> 3.2.1 Drainage from Diked Areas [40 CFR§112.8(b)(1)] <br /> 40 CFR§112.8(b)(1) of the SPCC Rule is not applicable because there are no diked oil storage <br /> areas at the Tesla Treatment Facility. <br /> 3.2.2 Allowable Drainage Valves [40 CFR§112.8(b)(2)] <br /> 40 CFR§112.8(b)(1) of the SPCC Rule is not applicable because there are no diked oil storage <br /> areas at the Tesla Treatment Facility. <br /> 3.2.3 Facility Drainage System Design [40 CFR§112.8(b)(3)] <br /> Facility drainage is shown in Figure A-4.3 and Figure A-4.4 in Appendix A. Any significant spill <br /> or discharge that occurs from the tanks,piping,valves, and appurtenance not retained by secondary <br /> containment, not contained by spill response efforts, or not pooled or retained by the ground <br /> surface at the discharge source, can potentially collect and flow by gravity into the stormwater <br /> drainage system that services the facility. At the Emergency Power Generation Facility, <br /> stormwater runoff and surface drainage is diverted via storm drain inlets,culverts and underground <br /> piping to the storm drain inlet located immediately south of the loading/unloading area. Drainage <br /> collecting in this storm drain inlet flows southward via a 15-inch underground stormwater sewer <br /> pipe and discharges into the retention basin located along the south side of the Tesla Treatment <br /> Facility. The retention basin is designed to collect all stormwater runoff and surface drainage from <br /> the Tesla Treatment Facility to allow for retention and sedimentation before drainage continues <br /> eastward via an underground sewer pipe to discharge off the property. Drainage then continues <br /> downslope along drainage channel towards Interstate Highway I-580, located approximately 0.6 <br /> miles east of the Tesla Treatment Facility. <br /> 3.2.4 Drainage Diversion System [40 CFR§112.8(b)(4)] <br /> 40 CFR§112.8(b)(4) of the SPCC Rule is not applicable to the Tesla Treatment Facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.