Laserfiche WebLink
Work(irder Details <br /> 5742356: Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> This completed official regulatory PM work order record must be copied and transmitted to the facility Chief for recordkeepirg at the facility. <br /> Asset: TES-POW-TNK-005 Generator #2 Secondary Containment Day Tank <br /> Metal: 12 Gauge <br /> Capacity: 150 US Gallons <br /> Tested Ai: 5 P.S.I. <br /> Location: TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA, 95377 <br /> CI: <br /> Sched Start: Site: WS Shop: WSCM <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 4/5/19 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0007 Job Plan: WS-FUL-TNK-INP-09-001 <br /> Actual Finish; Status: APPR 7P Description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 3/28/19 Parent: Crew: CM-EMT2 <br /> Reported By: SFONG Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone: 650-871-2013 GL Account: 25940-232422-10000-10029996- 0016 Classification: <br /> . . Plan Description <br /> wGsequence Task IDs 41 <br /> Measurement <br /> Sequence Task ID Description Status Point value Date Observa <br /> 0 10 12-Month EMT Inspection of Diesel Turk Components 1. Test local APPR 0 <br /> audible and visual alarms. 1� <br /> 2. Test control panel indicator lights. <br /> 3. Check that all corLtrol panel wiring and cables are free of <br /> corrosion, p r y secured and tighten all terminal connections. <br /> 4. Test Mgh el alarm for local and remote activation. <br /> 5. Confirm that loc vel indication matches SCADA data point <br /> display. r <br /> 6. Test tank leak detection system for operation. <br /> 7. Test and calibrate local dial gauge display. ✓ <br /> 8. Test and calibrate tank level monitoring. <br /> .. .. .. . ... ............... .... .... <br /> April 4, 2019 at 8:05:24 AM PDT 1 2 <br />