My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:28:07 PM
Creation date
7/11/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541548
PE
2832
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X <br /> 'V <br /> FTP-1 , PROVIDE (N) CONC. PAD TO <br /> MATCH (E) MIN 9" WIDER THAN EQUIP. <br /> ALL SIDES. SEE DETAIL C/M702. SECURE <br /> TO SLAB WITH %$"Ox3y" EMBED. A304/316 L1 IJ Lk �J <br /> STAINLESS STEEL BOLTS W/HILTI HIT—RE =I— = ==�_ � <br /> 8,000 GALLON ABOVE GROUND 500—SD EPDXY IN CONC., TYP., (6 TOTAL) II'— 1 j II IIL j-- - j II <br /> DIESEL FUEL STORAGE TANK 1 II I I II II I I II <br /> SECURE ABV PAD, TYP 4 II I I i t II <br /> PIPE SUPPORT ABV FIN PAD, SEE II I I I II I I II <br /> SEE 5 70 I I <br /> 70 II I I II II I I II <br /> C II I I II II I I II <br /> 70 II �1 GENERATOR I <br /> IIII I 1IIII FRP-1 , F <br /> UEL RETURN IIIIIIIIII �I1 GENERATOR 150 GALLON <br /> DAYTAN <br /> KS INS <br /> IDE <br /> 8'000 GALLON ABOVE GROUND IPUMP, (DUPLEX ENCLOSURE' VERIFY EXACT <br /> DIESEL FUEL STORAGE ICONNECTION LOCATIONS OF P. <br /> O <br /> .C.TANK LEAK TANK 2 PACKAGE), SECURE TO <br /> DETECTION 4 RAISED CONCRETE TO TANK STUBS W/GENERATOR <br /> (INTERSTITIAL SPACE) 7 <br /> V84411 _41 PAD (TYP) I I R <br /> SUPPLY FROM TANK ° SECURE ABV TANK, TYP I L _ _ I IL �_ _ �J I FRP-2 UG PIPING SUMP W LEAK <br /> TO FILTER V8441 0 1 SEE CONN. W/ FLEX COUPLING (TYP) I II II II DETECTOR TYP W/ <br /> I 6 ROUTE PIPES THRU GENERATOR CABINET II II 11 11 (TYP) <br /> %4"x45° CONT. INSTRUMENTS 70 SECURE IN PLACE (TYP) II II 11 11 <br /> CHAMFER ALL 1 1 18"0 MANWAY VENT (TYP) I I I I I I 11 <br /> AROUND. TRANSFER SYSTEM ° 11 I 11 <br /> 5 @ 12" OC MAX NORMAL VENT SOL 1 11 r 1I r <br /> ADJACENT AWAY MID DEPTH EMERGENCY VENT 0 SECURE TO CONC PAD I IIILH' I 1 11 I <br /> FINISHED TYP 4 PLCS , SEE I III I 1 11 I <br /> SLAB OF SLAB SECONDARY 0 ( ) 3 1 BALL VALVE 1 <br /> 1 L � J I I I L � J <br /> EMERGENCY VENT 70 I j I I I I (NP) I I I I SOLENOID <br /> PRIMARY SSV-2 1 11 SO ENOID 1 I 1 <br /> 1 SSV-1 1 FS CONN W/ANTISIPHON SOLENOID 1 1 1 VALVE V8414 <br /> RETURN FROM DAY TA K I I I I VALVE V8413 I 11 <br /> 7j1:7%.1'% <br /> —p" _ I VALVE (TYP) 11 II 11 11 <br /> 0 In � TANK FILL FROM I I 11 <br /> FUEL PORT 1 7—i <br /> 1 11 II I I 11 <br /> 5 @ BOT 8 FILTER RETURN TO TANK FLOW CONTROL VALVE TYP I <br /> # (TYP) <br /> I I � `� 11 I I I I � <br /> FILL V844 -- 2"0 FILTER RETURN PIPING, OVERHEA 1 I I 1 <br /> SELECTOR VALVE (TYP) V <br /> � — - - -1 L - - - - -1 <br /> CONCRETE PAD DETAIL C I1 m m 1 � 1 1 1111 m m 11 <br /> 841 II _ _ SIL SIL __ II _ _INL_ IIIA <br /> SCALE: NONE M—702 3" V8443 _ V8462 1 " FOS(D) ALONG PIPE SUPPORTS III ���1� �I(�� <br /> CONSTRUCTION JOINT N.C. BV F.O.R. BETWEEN TANKS <br /> @ TANK CONC PAD & — = <br /> PIPE & FUELING PAD 2" 2" <br /> SEE STRUCT'L r 1 1 <br /> PIPE SUPPORT NOM. 9' _ _------------- _----------_ ---- ------------ I — ---- -----------------J PROPANE TANK, SEE <br /> — ---- ---------- --- -------------- PLUMB'G DETAIL 1 <br /> ABV FIN PAD, MIN 7', Q L —J < 50 <br /> TYP, SEE 4 J 1 "-1/4"0 DOUBLE WALL U.G. 1 "0 DOUBLE WALL U.G. <br /> 70 " A FUEL RETURN PIPING SLOPE FUEL SUPPLY PIPING <br /> z BACK TO SUMP (TYP) <br /> EDGE OF SERVICE ROAD, o 0 : 0 0 0 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br /> SEE CIVIL PLANS 0 <br /> FP-1 FT-1 FSP-1 CONCRETE PAD OVER U.G. FUEL PIPING 4'-0" <br /> FUEL PORT FILTER TANK FUEL SUPPLY PUMP, CONTAINMENT SUMP, W/36"O, 300 PSF A <br /> (PROVIDE 4" RAISED DUPLEX SERVICE COVER AND FRAME; PROVIDE 1 „ <br /> OVERFILL PAD W/AUTOMATIC TANK W/LEAK DETECTOR, SEE 4"0 CONCRETE FILLED <br /> PREVENTION DRY BREAK HOSE SELECTOR CONTROL 2 BOLLARDS © 4' O.C., SEE 3 (NP) San Francisco Public Utilities Commission <br /> PER CFC CONNECTION. INSTALL PANEL 70 CO2 Tesla Treatment Facility <br /> 3404.2.7.5.8) @+36" A.F.S. SECURE <br /> 9000 W. Vernalis Road, Tracy, California 95377 <br /> CONTROL PANELS P� <br /> W/STRUT SUPPORTS. Spill Prevention Control and Countermeasure Plan <br /> (TYP) P. Studemeister <br /> Figure A-5.6 – Fueling System Site Plan <br /> Elec'I Rm. _ ABOVEGROUND FUEL STORAGE TANKS & EMERGENCY GENERATORS FUELING SITE PLAN CONTRACT NO. DB- 116 (WD-2609) <br /> 11 A CITY AND COUNTY of SAN FRANCISCO <br /> 110❑❑0❑❑0❑ SCALE: 3/16"=1 '-0" M-702 PUBLIC UTILITIES COMMISSION <br /> IID 0 TLS 350 PANEL, INVENTORY MONITORING AND LEAK INFRASTRUCTURE DIVISION <br /> 11 DETECTION CONTROL PANEL. ENGINEERING MANAGEMENT BUREAU <br /> CONTRACTOR TO MOUNT IN TYPE 4X LOCKABLE <br /> sty tec Howard <br /> Consulting Inc. TESLA TREATMENT FACILITY <br /> ENCLOSURE AT 48" ABOVE FIN GRADE. COORDINATION 0 4 8 12 16 � 405 ilowara street, 5th Floor <br /> LOCATION WITH WALL VENTILATION LOUVERS. San Francisco CA U.S.A.94608 <br /> SCALE: 3/16" = 1 '-0" Tel. 510.652.1412 FUELING SYSTEM <br /> Fax. 510.652.1857 <br /> Floride Storage NOTE: MFR. TO PROVIDE HEAT LOAD CALCULATION FOR <br /> CONSTRUCTION LEADERS Stantec www.stantec.com SITE PLAN <br /> E: :L PL 77/� SUBMITTAL TO ENCLOSURE MFR. FOR DESIGN OF <br /> O AS — BUILT <br /> PROJECT ENGINEER _ DRAWN BTG <br /> Stoe � VENTILATION SYSTEM. ALSO PROVIDE SUNSHIELDS FOR <br /> g PROTECTION FROM SUNLIGHT. PROJECT MANAGER RAF DESIGNED BTG CHECKED / APPROVED DRAWN SCALE <br /> ra <br /> RECORD DRAWINGS – THESE RECORD DRAWINGS HAVE APPROVAL RAF CHECKED BAB SECTION MANAGER DESIGNED DATE <br /> L)7� I BEEN PREPARED, IN PART, ON THE BASIS OF APPROVED APPROVED <br /> INFORMATION COMPILED BY OTHERS. THEY ARE NOT AB 04/15/11 As BUILT BTG BAB <br /> rB **� FOR THE SOLE USE OF THE DOCUMENT RECIPIENT ELEVATION INTENDED TO REPRESENT IN DETAIL THE EXACT 4 09/,3/,0 REVISED TRANSFER PUMP PIPING BTG BAB <br /> PARTIALCHEMICAL BUILDING — DO NOT CITE, COPY, OR CIRCULATE WITHOUT DATUMQ LOCATION., TYPE OF COMPONENT NOR MANNER OF 3 08/17/10 REVISED TRANSFER PUMP & PIPING BTG BAB MANAGER, ENGINEERING MANAGEMENT BUREAU MANAGER, WATER SUPPLY AND TREATMENT DIVISION <br /> THE EXPRESSED PERMISSION OF THE SFPUC. NAVD QQ CONSTRUCTION. THE ENGINEER WILL NOT BE NO. DATE DESCRIPTION BY APPR'D SHEET PLAN NO. DRAWING NO. REVISION NO. <br /> SCALE: 3/16"=l '—O" M-702 RESPONSIBLE FOR ANY ERRORS OR OMISSIONS, WHICH M-702 E-20050 <br /> HAVE BEEN INCORPORATED INTO THE RECORD DRAWINGS. REVISIONS of AB <br />
The URL can be used to link to this page
Your browser does not support the video tag.