Laserfiche WebLink
Wor"rder Details 0 r <br /> 5166108: TES TK-004 (contanlmmnt)Regulatory SPCC 12-Month Inspection of Diesel Tank Components <br /> This completed official regulatory PM work order record must be copied and transmitted to the facility Chief for recordkeeping at the facility. <br /> Asset: TES-POW-TNK-004 Generator#1 Secondary Containment Day Tank <br /> Metal: 12 Gauge <br /> Capacity: 150 US Callons <br /> Tested Ai: 5 P.S.I. <br /> Location:TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA. 95377 <br /> Cl: <br /> 5ched Start: Site: WS Shop: WSCM <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 4/5/18 Work Type: PM Lead: <br /> Actual Start: 4/11/18 PM Number: WS-TES-TNK-0006 Job Plan: WS-FUL-TNK-INP-09-001 <br /> Actual Finish: 5/11/18 Status: CLOSE )P Description: 12-Month EMT Inspection of Diesel <br /> Tank Components <br /> Report Date: 4/5/18 Parent: Crew: CM-EMT2 <br /> Reported By: KNAVARRET Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone:i 650-871-1016 GL Account: 25940-232422-10000-10029996+0016 Classlficatlon: <br /> job Plan Description <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Observa <br /> 0 10 12-Month EMT Inspection of Diesel ark Components 1.Test local CLOSE 0 <br /> audible and visual alarms. C� <br /> 2.Test control panel indicator lights. <br /> 3. Check that all control panel wiring and cables are free of <br /> corrosio properly secured and tighten all terminal connections. <br /> 4. Test High level alarm for local and remote activation, <br /> v <br /> S. Confirm that pI�cal level indication matches SCADA data point <br /> display. ^ <br /> 6. Test tank leak detection system for operation. I_Ok- <br /> 7.Test and calibrate local dial gauge display. <br /> 8.Test and calibrate tank level monitoring. n 4 <br /> April 8, 2019 at 12:18:07 PM PDT 1 2 <br />