My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:54:12 PM
Creation date
7/11/2019 4:50:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> ENVIRONMENTAL HEALTH IdEPARTMENT <br /> PpU�N <br /> SAN JOAQUIN COUNTY <br /> Qa r Donna K. Heran, R.E.H.S. Program Coordinators <br /> Director304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> �'•',r ;',r. Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E,14.S., R.D.I. <br /> Laaret Assistant Director Mar orio, R.E,H.S. <br /> 4�+ oar Telephone: (209)468-3420 g g <br /> Robert McClellon, R.E.H.S. <br /> Fax: (209) 464-0138 Jeff Carruesco,-R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley, R.E.H.S. <br /> DICK L.ELAND <br /> R & L BUSINESS MANAGEMENT (FORMERLY STOCKTON PLATING) <br /> 3826 GLENEAGLES DRIVE <br /> STOCKTON CA 95219-1832 <br /> i <br /> RE: Stockton Plating soil SITE CODE: 1986 it <br /> 632 S. El Dorado Street <br /> Stockton,'CA 95203-3407 <br /> b <br /> WORK PLAN: Soil Sampling Work Plan <br /> DATED: October 6,'2006 ' <br /> PREPARED BY: AGE 1 <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUM NEEDED: Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)1: + <br /> 1. Due to lou;soil vapor concentrations from remediation wells associated with the on site SVE.system,4 <br /> confirmation soil borings will be advanced by AGE and discrete samples will be collected for analysis. <br /> 2. The 4 soil borings will extented to 50 feet BGS in the source area. <br /> 3. Soil samples will be analyzed for TPH-gas and BTEX,including MTBE.. <br /> C01\1.NTS AND CONDITIONS: <br /> 1. All soil and vapor sample results.should be-evaluated/screened for environmental concerns and findings ? <br /> submitted in the next report. { <br /> DATED Z BY <br /> i <br /> Harlin Knoll,Senior RENS (209)468.3442 <br /> Cc: AGE <br /> .i <br />
The URL can be used to link to this page
Your browser does not support the video tag.