My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:54:12 PM
Creation date
7/11/2019 4:50:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO' <br /> kMENTAL HEAL TADEPARTMENT <br /> Donna K.Reran,R.E.H.S. SAN JOAQUIN COUNTY <br /> NI-4 <br /> X <br /> Director 304 East Weber Avenue, Third Floor Unit Supervisrs <br /> At Olsen,R.E.H.S. Carl Borgman,R-E.H.S. <br /> Stockton, California 95202-2708 R.D.1, <br /> Progrdm'M�nager Mike Huggins,R.F.II.S., <br /> Laurie A.COtulla,R.E.H.S. Telephone: (209) 468-3420 Douglas W.Wilson,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Margaret Lagorio'R.E.H.S. <br /> Robert mcClellon,R.E.H.S. <br /> Mark Barcelloso R.E.H.S. <br /> DICKLIELAND <br /> R & L BUSINESS MANAGEMENT (FORMERLY STOCKTON PLATING) <br /> 31326 GLENEAGLES DRIVE <br /> STOCKTON CA 95219-1832 FILE u-py <br /> REr Stockton Plating SITE CODE- 1986 <br /> 632 S. El Dorado Street. <br /> Stockton, CA 95203-3407 <br /> WORK PLAN: Soil Vapor Extraction Modification Work Plan <br /> DATED; I july'8,2004 <br /> PREPARED BY: AGE <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUM NEEDED: Submit by: <br /> ADEQU ATE AND NECESSARY ELEMENTS OF THE WORK PLAN.[H&S 25296.10 (c)(3)]: <br /> 1 Due'to tow vapor concentration from remediation wells associated with the on site remedial system, the <br /> electric catalytic oxidizer unit iiiiitial.installed for remediation has become-less effici&nt and costly to <br /> operate and.AGE has recommended system replacement. EHD agrees with this recommendation and <br /> change out. <br /> 2. AGE will install a 3.5 HP vacuum blower that will yield 30-40 inches of water at a flow rate of 125-150 <br /> sc fin., <br /> 3. Low emissions generated by the modified system may not require remedial controls. <br /> 4. Monthly system monitoring will be performe'd and reporting to the appropriate agencies Will continue, <br /> COMMENTS AND CONDITIONS: <br /> 1. All necessary permits for equipment change-out,system Operation,and vapor emissions must be procured as <br /> required by the appropriate agencies. <br /> DATED <br /> Harlin Knoll.Senior REHS (2Q9 468-3442 <br /> is <br /> Cc: 'AGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.