Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:www.sigov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CHEROKEE LANE SERVICE STATION* 900 S CHEROKEE LN, LODI October 17, 2016 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 105 CCR 2632(d)(1) Failed to have an approved UST monitoring plan. <br /> The monitoring plan is not current. The 87A 12,000 gallon UST system and the diesel 10,000 gallon UST system <br /> should each list VMI as the mechanical line leak detector manufacture and LD 99-2000 as the model. The <br /> monitoring plan must be uploaded to the California Environmental Reporting System (CERS). Immediately log into <br /> CERS, make the necessary changes, and submit for review by the EHD. <br /> This is a repeat violation, Class II. <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed. <br /> An accurate UST Monitoring Site Plan was not submitted. The site plan uploaded into CERS on 7-14-14 does not <br /> list the mechanical line leak detectors, the float and chain leak detection mechanism within the UDC sumps, nor the <br /> Incon monitoring panel. A site plan must be submitted identifying the locations where monitoring will be performed. <br /> Immediately log into the California Environmental Reporting System (CERS) at http://cers.calepa.ca.gov/and upload <br /> a copy of the UST Monitoring Site Plan. <br /> This is a repeat violation, Class II. <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days. <br /> Annual monitoring system certification, leak detector testing, and spill container testing was performed on October <br /> 12, 2015 and a test report was submitted on January 26, 2016 , 3 months late. A copy of the test report must be <br /> submitted within 30 days of the tests. Take all necessary precautions to ensure testing and submittal of test reports <br /> are performed in a timely manner. <br /> This is a repeat violation, Class ll. <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on October 12, 2015 and an inspection report was issued identifying information to be <br /> submitted to bring this site into compliance. This information was required to be submitted by November 12, 2915. <br /> This information has not been received resulting in a non-compliant status for this facility. An operator that receives <br /> an inspection report shall have 30 days to submit a written response that includes a statement documenting <br /> corrective actions taken or proposing corrective actions which will be taken. Ensure that a written response <br /> documenting corrective actions taken or proposed is submitted within 30 days of receiving an inspection report. <br /> Violations still Open: <br /> - HSC 25292.2 Current financial responsibility documents not submitted <br /> -CCR 2711 UST Operating Permit Application for Facility and Tank information not submitted or current <br /> -CCR 2632 Monitoring and Response Plan not current or approved by EHD <br /> -CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed <br /> CCR 2638(d) Failed to submit monitoring system certification test report within 30 days <br /> This is a Class II violation. <br /> FA0000556 PR0231841 SCO01 10/17/2016 <br /> EHD 23-01 Rev.09/22/16 Page 4 of 6 Underground Storage Tank Program OIR <br />