My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:58:23 PM
Creation date
7/12/2019 1:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />9. FILL RISER CONTAINMENT SUMP TESTING <br />�5 <br />Page of <br />OCT 19 2015 <br />Facility is Not Equipped With Fill Riser Containment Sumps h <br />Fill Riser Containment Sumps are Present, but were Not Tested ENVIRONME <br />"Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure Vacuum - Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />Fill Sump # Fill Sump # Fill Sump# Fill Sump # <br />Sump Diameter: <br />Depth: <br />-Sump <br />Height from Tank Top to Top of <br />Piping Penetration: <br />-Highest <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />water and starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />in Reading (RF-Ri): <br />-Change <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Is there a sensor in the sump? <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.