My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:58:23 PM
Creation date
7/12/2019 1:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />S. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />RLC V E <br />0%4 9295 <br />■A, , <br />Test Method Developed By: ❑UDC Manufacturer Industry Standard X Pro <br />pt�TAAG�) <br />Li Other (Specify) <br />Test Method Used: ❑ Pressure Vacuum X Hydrostatic <br />_' Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />I DC # 9 l D('# 9-Satelite <br />UDC # UDC # <br />UDC Manufacturer: Bravo Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />9" <br />9" <br />Height from UDC Bottom to Top <br />Enters from bottom <br />Enters from bottom <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Enters from bottom <br />Enters from bottom <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested' <br />Water Level 8" <br />Water Level 8" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />No <br />No <br />product and water)?* <br />Turbine shutdown response time <br />N/A <br />N/A <br />Is system programmed for fail- <br />Yes <br />Yes <br />safe shutdown?* <br />Was fail-safe verified to be <br />No <br />No <br />operational?* <br />Wait time between applying <br />5 Minutes <br />5 Minutes <br />water and starting test <br />Test Start Time: <br />8:50 <br />8:55 <br />Initial Reading (Rj): <br />.001 <br />.001 <br />Test End Time: <br />9:20 <br />9:25 <br />Final Reading (RF): <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />Change in Reading RF-Ri): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Was sensor properly replaced and <br />Yes <br />Yes <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to _y of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.