Laserfiche WebLink
SWRCB, January 2002 <br />Kase K)- of -- <br />_ 7. UNDER -DISPENSER CONTAINMENT UDC TESTING. <br />Test Method Developed By: IJDC Manufacturer 0 Industry Standard /`Professional Engineer <br />I'] Other (:Specify) I ' <br />Test Method Used: !-1 Pressure 01 Vacuum ' �i Hydrostatic <br />Other (.Specify) <br />Test Equipment Used: (7o l,J . rN r 1 ),Equipment Resolution: <br />UDC Manufacturer: <br />`� ;.,,) o <br />(->, •P, •7 <br />UDC Material: <br />r*, 011 <br />UDC Depth: <br />Height from UDC Bottom to Top <br />ofHighest Piping Penetration: <br />S e_0 ( r,w.s^.. <br />-- <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />,. IF) tui <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water ?' <br />D Yes )YNo 0 NA <br />D Yes ,Q'No ❑ NA <br />❑ Yps D No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />f. ' <br />Is system programmed for fail- <br />safe shutdown? <br />❑ Yes V No D NA <br />D Yes -l7No DNA <br />❑ Yes . D No D NA <br />D Yes I] No 13 NA <br />Was fail-safe verified to be <br />operational?* <br />El ❑ No D NA <br />❑ Yes ❑ No ;f] NA <br />, <br />❑ Yes ❑ No ❑ NA <br />❑ Yes D No ❑ NA <br />Wait time between _appling <br />pressure/vacuum/,water td <br />starting test <br />lo! - <br />Test Start Time: <br />/ v <br />Initial Reading (R1): <br />Test End Time: <br />Final Reading (RF): <br />a <br />, <br />Test Duration: <br />Change in Reading RF -R,): <br />j <br />Pass/Fail Threshold or Criteria: <br />c� �, �" -y „�: <br />r ;` ; •.�,� �. o <br />Test Result: <br />,Pass ❑ Fail <br />2'Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass D Fail <br />Was sensor removed for testing? <br />es ` No ❑ NA <br />D Yes Rf4o ❑ NA 1 <br />0 Yes D No D NA <br />0 Yes D No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />Xy 0 No ,_:, NA <br />D Yes D No -,'NA <br />�` <br />"D Yes ❑ No 17 NA <br />❑ Yes ❑ No f7 NA <br />Comments — (include information on re .airs made prior to testing and recommended ollow-u or ailed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to luy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />