My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 1994 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:29:19 PM
Creation date
7/12/2019 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2010
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />li ) <br />Page—(.) of 1 <br />Facility is Not Equipped With Spill/Overfill <br />Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: <br />'_7 Spill Bucket Manufacturer <br />I.Other (Spec) <br />Industry Standard : Professional Engineer <br />Test Method Used: <br />C Pressure <br />Other (Spec) <br />Vacuum Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />e <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />— <br />Test Start Time: <br />Initial Reading (R]): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br />._ tt <br />�. r . %� ( C.: �. r., 1 /' i ) f (`,) ' ,,r. ] <br />l% 1" ��J.i_/ ( � r.� �' � ��, ,7{6 � _� ._; � `•'1 r') � �% �,1`'!f / � � 1 `�, r� :i ;t , <br />
The URL can be used to link to this page
Your browser does not support the video tag.