Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PYPF. TV.qTTNC <br />- <br />Page -3 of <br />]CI <br />Test Method Developed By: <br />aping Manufacturer 0 Industry Standard 0 Professional Engineer <br />Engineer <br />El Other (Specify) <br />Test Method Used: <br />Xwessure <br />0 Other (Spec& <br />0 Vacuum <br />0 Hydrostatic <br />Test Equipment Used: ?oe55 (-&44 el 4( <br />,,r 5 T 0 0 5 tj AA,V*�., Equipment Resolution: <br />.......... =gva <br />10 <br />Ef Piping Run # Piping Run # Piping Run -!p 51'. A <br />=191.1 =I" <br />=%MkMln=� <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />311 <br />3 1 <br />Length of Piping Run: <br />/4-P PYW, I F-12 <br />- (U YPx, 14e fp <br />w 1901 <br />Product Stored: <br />t <br />9 <br />Method and location of- <br />piping -run isolation: <br />bee ee 4- <br />54- .4 <br />5 -r-10 -L <br />4- <br />-7�s4 10,el 4- A T-7— <br />—7;; -r -4 ,W- 4- _e - <br />Wait time between applying <br />ress r vacuum/water d <br />an <br />,t Wug <br />st 'test: <br />Test Start Time: <br />atv <br />3 0 <br />Initial Reading (RD: <br />5 P S <br />5 g <br />15 P S.T- <br />5 P5:r <br />Test End Time: <br />LO , 'a to <br />1 0 1 16 <br />t 0 1. 10 <br />Final Reading (RF): <br />5 P5= <br />P 5 T- <br />:5P 5 :I- <br />Test Duration: <br />I1. o U Y <br />b. a u - <br />Change in Reading (RF-Rj): <br />p 5--.r <br />Pass/Fail Threshold or <br />Criteria: <br />nj <br />lue Lz, 5s t3 I= <br />n <br />"Val-40jSW1PSZ <br />Test Result: <br />Pass 0❑Fail <br />ass 0 Fail <br />XPass 0 Fail <br />Pass 0 Fail <br />- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />