Laserfiche WebLink
S WRCB, January 2002 <br />6_ PTPTNf RUNTP TF.CTTNf_ <br />Page of U <br />Comments — (include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard Professional Engineer <br />0 Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: 6fe k4l-)ell Z�- �` e �_ �.", <br />Equipment Resolution: , ppZS <br />�{;� �6s �,����'p 4, �' 't^�"�inr� N. ... &Y'. M :. AY.rf aEA+_:5. nµ "�Jt^; „;y;„s:c. <br />Sump # Sump # L <br />e:?.>fK"'' :vS - ,kxEraf'. ' � ani.. 3r�' M ,. :fi. a?i•'a,ta <br />,�.._ <br />Sump # Sump # <br />Sump Diameter: <br />Z <br />i4 1) 1 <br />41211 <br />Sump Depth: <br />,Z' " <br />.511) <br />33_'T2 <br />Sump Material: <br />i I w 5 5 <br />izgv_jj ce 6 <br />a 5 <br />F, <br />Height from Tank Top to Top of1 <br />Highest Piping Penetration: <br />I I <br />� rl <br />Z g 11 <br />C } I <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />r <br />y <br />�V) t-tjy <br />Portion of Sump Tested <br />W u I-er La u�l, $ ? <br />We,.,l,w 14uE t -.: $1 f <br />I.t3a�-�►' tQ,vLtr-3 `t <br />W ei c a- L app C .?,�" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />dyes 0 No ❑ NA <br />es ❑No DNA <br />es 0 N DNA <br />es El No 11 NA <br />roduct and water)?* <br />Turbine shutdown response time <br />15 52 C , <br />l S C . <br />l "? St C <br />t S Sec. <br />Is system programmed for fail-safe <br />`Yes ❑ No El NA <br />shutdown? <br />es 0 No 0 NA <br />ZYes 0 No ❑ NAes <br />❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?* <br />Mes ❑ No ❑ NA <br />- <br />❑ No ❑ NA <br />)Yes 0 No ❑ NA <br />XYes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacu ter d starting <br />test: <br />^-U4,4, 4 es <br />r <br />r3 <br />16 r.- S <br />Test Start Time: <br />$ ; 25 <br />2.0 <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Y�6 Cl�CCo <br />�`C/�iG <br />/F`�S G�'�((y'r-ylidrlr <br />Test Duration: <br />�D�-iir f-�s <br />3ar�v�" 1 -e -s <br />�D�y%✓!rr/��S <br />3Dr>�s <br />Change in Reading (RF -R,): <br />Na G� <br />rMlr t. G• - <br />_ <br />wV <br />Pass/Fail Threshold or Criteria: <br />bd.S >:Oi %+� <br />110ZAP6 *= <br />, DO S`34- <br />Test Results <br />Pass ❑ Fail <br />ass 0 Fail <br />ass ❑ Fail <br />k Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ No ❑ NA <br />es 0 No DNA <br />Was sensor properly replaced and <br />verified functional after testing? <br />s ❑ No 0 NA <br />❑ No ❑ NA <br />es ❑ No ❑ NA <br />es ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />