My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO 1994 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:29:19 PM
Creation date
7/12/2019 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2010
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gaup nb / SIR Equipment: ❑ qre& this box if tank gauging is used only for inventory control_ <br />check this box if no tank gauging or SIR equipment is,installed. <br />This section must be completed if in -tank gaining equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yca <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for goutid faults" <br />❑ Yes <br />(❑ Yes <br />❑ Not <br />❑ No' <br />Were all tank gauging probes visually inspected for damage and residue buildup^ I <br />Was accuracy of system product level readings tested? <br />Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />:1 No* <br />Were all probes reinstalled properly' <br />Z, Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />in the Section n, below, describe how and when these deficiencies were or will be corrected_ <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />Check; this box if LLDs are not installed. <br />Yes <br />j ❑ No' 1 For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />i ❑ N/A ! (Check all that apply) Simulated leaks rate: 0 3 e.p.h.; ❑ 0. l g.p.h ; ❑ 0? g.p.h. <br />� 1 <br />V'- s <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />1 Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />❑ y'o* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak'' <br />I <br />(❑ Yes <br />❑/NO* <br />d N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ Flo* <br />CT N/A <br />I For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test" <br />❑ Yep <br />❑ _ * <br />_ /A <br />For electronic LLDs, have ail accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.