My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007819
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:51:57 PM
Creation date
7/15/2019 4:34:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007819
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fi - ,"•—r— t ! 1-.x-n.>e; ;!n>ud..u.��-i�---+�.= <br /> Site Background Information Former Stockton Plating Facility <br /> Page 7 of 7 <br /> the ground water extraction pumps, process pump and holding tank float controls were connected <br /> I to the electrical control panel Pump controls are supplied by a pressurized air line for the pump <br /> controls From the process pump, I-inch diameter PVC tubing(schedule 40)was routed to a 5-gallon ' <br /> suspended solids filter chamber equipped with 25-micron replaceable blown-fabnc sediment filter J't'4 <br /> 4 41 <br /> bags From the filter chamber, schedule 40 PVC tubing was `routed to the two 2,000 pound vessels <br /> I containing GAC The GAC media vessels are designed to adsorb hydrocarbons compounds Brass ' i <br /> x sampling ports were installed at the influent, between the media vessels and at the effluent to allow <br /> sampling for detection of potential media break through and to obtain final discharge samples The <br />' ground water pump and treat system layout is depicted in Figures 3 <br /> r G <br /> A battery operated, F-2000 (model RT) Blue-White Industnes flaw meter was installed'on the <br /> effluent line to continuously measure and display the effluent flow rate and to continuously measure <br /> 7 <br /> ' r and display the total flow The flow meter is designed to operate between 6 and 20 gallons per <br />' minute A Lower Explosive Level(LEL)meter was installed on the ground water effluent at the site <br /> The ground water treatment system is enclosed within a chain-link fence on the east side of the site` <br /> 1 <br />' A dedicated,2-inch diameter PVC discharge pipeline was constructed from the treatment system to fi <br /> a sewer drain located at the eastern edge of the site Waste water is discharged to the City of <br /> Stockton`sewer system under permit The discharge piping system layout is depicted in Figure 3 , <br /> I <br /> , <br /> + I <br /> r <br /> _ a <br /> J <br /> � ' e <br /> n <br /> ' � 1 <br /> I <br /> J ' <br /> Advanced GcoEnvironmental,Inc <br /> t � , <br />
The URL can be used to link to this page
Your browser does not support the video tag.